Opportunities per Page
Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.
From Date
To Date
Opportunities per Page
Charlotte Storm Water Services / Construction
The Shade Valley Pond Repairs Project
Charlotte Storm Water Services / Construction
Morning Dale Storm Drainage Improvement Project
The Morning Dale Storm Drainage Improvement Project will reduce street and structure flooding throughout the neighborhood. Located within a drainage area of approximately 560 acres, the project will replace and/or rehabilitate aging infrastructure and provide adequate drainage system capacity. This project area is bordered by Hinson Drive to the north, Stratfordshire Drive to the south, Tadlock Place to the east and Morning Dale Road to the west.
Department of General Services / Construction
Lawyers Rd SW (Harri Ann to Chestnut)
The scope of this project will include 0.34 miles of new 6ft wide concrete sidewalk, driveway improvements, and wheelchair ramps on Lawyers Rd from Chestnut Lake Dr to Harri Ann Dr.
Charlotte Department of Transportation / General Services
Locating Services for the Charlotte Department of Transportation (CDOT ... Locating Services for the Charlotte Department of Transportation (CDOT)
This contract will be for fiber optic cable physical locating, marking, and positive responses to NC811 of CDOT’s underground infrastructure as required by the Underground Utility Safety and Damage Prevention Act, Article 8A of Chapter 87 of the North Carolina General Statutes. Work provided under this contract is to supplement CDOT’s current in-house locates unit and will cover the city of Charlotte limits.
Charlotte Area Transit System / General Services
FTA 5310 FY23 Call for Projects
The Charlotte Area Transit System is seeking contractors for the U.S. Department of Transportation Federal Transit Administration Enhanced Mobility of Seniors and Individuals with Disabilities Grant Program (Section 5310). Section 5310 funds are available for capital and operating expenses to support transportation projects that meet the special transportation needs of seniors (individuals 65 years and older) and individuals with disabilities. All projects must be situated in the Charlotte-Mecklenburg Urbanized area and must be derived from the Coordinated Human Services Transportation Plan for the Charlotte Urbanized Area (FY2022-FY2027).
PSR # 1785
Department of General Services / Construction
Belk Greenway Connector
Belk Greenway Connector is a cycle track project. This project will involve shifting the medians on McDowell St to make room for the cycle track, replacing noncompliant curb ramps, replacing noncompliant pedestrian signals, transferring signal heads to new mast arms, mill & overlay, pavement markings, sign installation, and the removal of 4 median trees.
Department of General Services / Construction
Arrowood at Whitehall Commons Intersection
This is an intersection project which will involve installing a new traffic signal with pedestrian signals, widening some of the approaches, replacing all curb ramps, mill & overlay, and pavement markings. The traffic signal will use steel strain poles.
Department of General Services / General Services
Vehicle Accessories and Up-fitting
The City of Charlotte requires qualified light vehicle dealers and general service providers to work in conjunction with the Fleet Management Division to support the city’s various up-fitting needs including but not limited to window tenting, bed liner installing, lift gates, and truck bed shells.
City Wide, Department of General Services / General Services
General Vehicle Collision Repair Services
The City requires qualified service providers to work in conjunction with the City’s Fleet Management staff to perform complete turnkey collision repairs and related services on city fleet and Mecklenburg County vehicles. Collision repairs may include but are not limited to paint and body work, frame, cooling systems, engine components, transmission, steering, and related part repairs or replacement.
Aviation, Department of General Services / General Services
Vehicle and Equipment Welding and Related Services
The City requires a company to work in conjunction with Fleet Management, the Airport and other city departments to provide Vehicle and Equipment Welding and Related Services to the City of Charlotte. The Company shall perform vehicle or equipment maintenance, repair, and modification through the provision of Vehicle and Equipment Welding and Related services for vehicles and equipment owned, operated, or maintained by the City.
Charlotte Storm Water Services / Construction
Collective AH (6633 Brookfield Place, 524 Wilby Drive)
524 Wilby Drive: The culvert will be constructed with a headwall and endwall, with the junction box In between. The 24” plastic pipe will be replaced with 24” RCP.
6633 Brookfield Place: 30” RCP from JB 9 to DCB 8 to be replaced with a 36” RCP , and curb to be added along Alexander Road and standard catch basins to be constructed along the curb.
Charlotte Storm Water Services / Construction
Pella Rd 6212 Project
Project consist of joint repairs and the lining of 563 LF of 66 CMP with CIPP. Three non-standard and three standard structures will be removed/replaced as well as two headwalls. 57 LF of 24 inch RCP will be removed and replaced. A rip rap apron will be revised/installed. 70 LF of an 8″ water main will also be relocated.
The Shade Valley Pond Repairs project was initiated in order to relieve the City of significant efforts and costs of ongoing pond maintenance. Proposed improvements to the pond are intended to address nuisance vegetation, increase storage capacity, address geese issues, and enhance the overall aesthetics of the pond. Goals are to restore pond to “below normal pool” volumes via dredging of forebay and main pool to increase water quality function and remove available nutrients contributing to duckweed and algal blooms. The entirety of the pond and littoral shelf will be replanted with wetland plantings and trees to enhance aesthetics and decrease attractiveness of pond to geese. Geese preventative measures are proposed to establish plantings.