9th and College Storm Drainage Improvement Project

The 9th and  College Storm Drainage Improvement Project is located in Uptown Charlotte within the 9th Street Right-of- Way between North College Street and the CATS Blue Line Extension light rail. The project will upgrade and replace storm drainage, sanitary sewer, and water main infrastructure within this block of 9th Street. The project will also include sidewalk, hardscape, pavement, and pavement markings replacement.

Relocation of West Boulevard (NC 160) (Construction)

The West Boulevard Project includes the construction of approximately 1.2 miles of the future West Blvd by realigning existing Byrum Drive and existing Piney Top Drive from the intersection of Steele Creek Road and West Blvd to the intersection of West Blvd and Piney Top Drive.  The Project includes construction of a new intersection of proposed West Blvd and Byrum Drive and a new intersection of proposed West Blvd and Piney Top Drive.  Disciplines will include roadway, hydraulics, erosion control, signals, traffic management, pavement marking, signing, utility design, and utility relocation.  Existing portions of West Blvd between Steele Creek Road and Piney Top Drive will be removed as part of a separate project.

4th Parallel Runway Runway Package 1: Taxiway V and Connectors

The first phase of constructing the Fourth Parallel Runway at CLT is the southward extension of existing Taxiway V and construction of related connector taxiways.  The project includes demolition, erosion and sedimentation control, grading, drainage, airfield concrete and asphalt paving, marking, fencing, and airfield lighting/signage.  The new taxiway will meet FAA Taxiway Design Group (TDG) 5 requirements.

Storm Water Repair and Improvement FY2021-A

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.

McAlpine SR2 and SR3 Stream Repairs – CANCELLED

The purpose of the project is to repair approximately 700 linear feet of stream restoration between 2 different tributaries.  Failing structure will be replaced or repaired such that they function as originally intended.  Repairs will be performed with minimal disturbance to buffer vegetation and vegetation of appropriate size will be re-established after repairs are completed.  Repairs will include but not limited to, removing and resetting boulders and logs for in-stream structures and adding or repairing constructed riffles.

This will not be bid