Ashe Plantation WWTP – Phase II Upgrades

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon

Posting Number 2023-Q3(Jul-Sep)-CW-4792

Anticipated Posting Date 2023-09-28

Commodity Code(s): 91071, 91200, 91244, 91319, 91345, 91396, 92500, 96239, 96884, 98157, 98814

Solicitation Link: https://charlottenc.bonfirehub.com/opportunities/108305

The Project consists of the demolition of the existing 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration, clarifiers), filters, generator, shed and select yard piping. The new infrastructure includes a new 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration), two clarifiers, pre-engineered office/lab building, generator and the associated yard piping, site work, electrical and instrumentation. This scope of work also includes the relocation of and existing 8” gravity sewer line.

Requirements

Last Updated: 10/05/23
Insurance Requirements+
Bonding Requirements+
Subcontracting Opportunities+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Katherine Osborne

City Contact

katherine.osborne@charlottenc.gov