Design and construct a new 2-story, 3-bay firehouse at 14,626 square feet, to be located at 5800 North Tryon Street. This facility will be a new infill firehouse that will alleviate high call volume for surrounding firehouses. A new firehouse must be built when a new “point of dispatch” is required in order to meet response time standards. The proposed facility will be located on a 2.03-acre parcel that facilitates the redevelopment of abandoned/underutilized sites and vacant sites. This location and site selection shall meet the City of Charlotte Policy for Sustainable City Facilities and Charlotte Fire Department Facilities Master Plan.
This project will pursue LEED certification. The site will incorporate solar panels and a geothermal well system with water source heat pumps.
Charlotte Water (CLTWater) is planning to replace water services on Queens Road West between East Boulevard and Selwyn Avenue and water pipes under Queens Road West from Wellesley Avenue to Selwyn Avenue and East Boulevard near Queens Road West. The Queens Water Main Replacement Project’s completed design and construction have not been scheduled yet.
The Project consists of the installation of 250 LF of 8” sewer; 3,060 LF of 16” sewer; 3,100 LF of 18” sewer; 37 manholes; bypass pumping of wastewater; and other related sewer installation/replacement work for the Upper Little Sugar Creek Replacement Sewer Phases 2 and 3 portions. For the 911 Georgetown SDIP, the project consists of the Installation of 394 LF of 5’ X 4’ Precast R.C. Box Culvert; 60 LF of 10’ X 8’ Precast R.C. Box Culvert; 9 masonry drainage structures; and other related storm drainage installation work.
This project spans approximately 1.5 miles and will add transportation capacity along Lakeview Road from Cushing Drive to Old Statesville Road to accommodate the additional traffic expected as a result of the construction of NCDOT’s I-77 Lakeview Road Direct Connect Interchange project. Improvements under this project will include pavement upgrades, intersection modifications, additional through/turning lanes, upgrading drainage infrastructure, and pedestrian and bicycle facilities.
The project will provide infrastructure improvements that include sidewalk, curb and gutter, milling- resurfacing, pedestrian refuge and signals, cross walks, planting strips, street trees, pedestrian and street lighting, bike lanes, and on-street parking. The project will provide 0.4 miles of streetscape along 36th street between North Tryon Street and Davidson Street. The project will tie into the Blue Line Extension project on 36th street.
This unspecified contract will provide horizontal construction services on an as-needed basis to the Engineering Department. The work includes traffic control, erosion control, clearing and grading, drainage, milling, asphalt paving, pavement markings, retaining wall, concrete curb, sidewalk, driveways, pedestrian refuge island and wheelchair ramps, utility relocation and installations.
This unspecified contract will provide horizontal construction services on an as-needed basis to the Engineering Department. The work includes traffic control, erosion control, clearing and grading, drainage, milling, asphalt paving, pavement markings, retaining wall, concrete curb, sidewalk, driveways, pedestrian refuge island and wheelchair ramps, utility relocation and installations.
This unspecified contract will provide horizontal construction services on an as-needed basis to the Engineering Department. The work includes traffic control, erosion control, clearing and grading, drainage, milling, asphalt paving, pavement markings, retaining wall, concrete curb, sidewalk, driveways, pedestrian refuge island, and wheelchair ramps.