The Fourth Parallel Runway Program – North End-Around Taxiway (NEAT) Extension – Volume I includes the construction of 75 feet wide x 5,300 feet long new taxiway with two connector taxiways. Primary work elements include 18-inch Portland cement concrete pavement; cement-treated base course; crushed aggregate base course; asphalt shoulders; pavement markings; mass grading; 15” – 84” drainage pipes; cast-in-place and pre-cast structures; underdrains; airfield electrical including duct banks, cabling, lighting, and signage; erosion control; asphalt service roads; and fencing. The project also includes Stockpile Site – Volume II. Primary work elements include pavement, slab on grade, and foundation demolition; building demolition; utility removal; asphalt roadway; waterline installation; mass grading; erosion control; and fencing.
Fiscal Year 22 Water Main Rehabilitation
This project will clean and apply a polymer coating to the interior walls of old, but still structurally sound cast iron water mains. Also included is the replacement of all valves, hydrants, and galvanized service lines associated with each project. The work completed in this contract will improve water quality and flow in the distribution system; consists of an undetermined number of individual projects consisting of water infrastructure rehabilitation; and/or replacements, which will be assigned by the Project Engineer.