Idlewild Road and Monroe Road Intersection

This project will improve the Idlewild Road and Monroe Road intersection to enhance conditions for all users. Improvements will include pavement widening to accommodate dual left turn lanes at all intersection approaches, bike lanes or multi-use paths, pedestrian refuge islands, and new sidewalks.

Idlewild Road/Rama Road/Monroe Road Intersection

This project will improve the Idlewild Road and Monroe Road intersection to enhance conditions for all users. Improvements will include pavement widening to accommodate dual left turn lanes at all intersection approaches, bike lanes or multi-use paths, pedestrian refuge islands, and new sidewalks.

Airport Tree Clearing

As part of the 4th Parallel Runway project, the Airport will solicit bids for tree clearing, erosion and sediment control. While the final bid package will contain exact line items, it is anticipated for the tree clearing to be roughly 160 acres. The tree clearing will consist of setting perimeter erosion control measures, cutting and hauling off of timber, but will not include any grubbing, clearing or grading.

Specialized Roadway Construction Services FY23A

This unspecified contract will provide horizontal construction services on an as-needed basis to the General Services Department. The work includes: traffic control; erosion control; clearing and grading; drainage; milling; asphalt paving; pavement markings; retaining wall; concrete curb, sidewalk, and driveways; pedestrian refuge island, and wheelchair ramps; utility relocation and installations; and related activities.

Specialized Roadway Construction Services FY23B

This unspecified contract will provide horizontal construction services on an as-needed basis to the General Services Department. The work includes: traffic control; erosion control; clearing and grading; drainage; milling; asphalt paving; pavement markings; retaining wall; concrete curb, sidewalk, and driveways; pedestrian refuge island, and wheelchair ramps; utility relocation and installations; and related activities.

Street Resurfacing

This project involves street resurfacing and associated functions throughout the City. The project includes traffic control, asphalt and concrete pavement milling, asphalt paving, base failure repair, asphalt surface treatment, utility adjustments, manhole frame and cover replacements, wheelchair ramp installation, sidewalk, curb repairs, and pavement markings.

Lawton Road Storm Drainage Improvement Project

The Lawton Storm Drainage Improvement Project (SDIP) is for storm water infrastructure improvements along Worth
Place to the system outfall downstream of Lawton Road. This work will include
removal, replacement and abandonment of storm drainage pipes and
infrastructure, active shoring for pipe installation, asphalt paving, concrete
work, and any other associated work required by the Engineer.

Fiscal Year 22 Water Main Rehabilitation

This project will clean and apply a polymer coating to the interior walls of old, but still structurally sound cast iron water mains.  Also included is the replacement of all valves, hydrants, and galvanized service lines associated with each project.  The work completed in this contract will improve water quality and flow in the distribution system; consists of an undetermined number of individual projects consisting of water infrastructure rehabilitation; and/or replacements, which will be assigned by the Project Engineer.

CMPD Animal Care and Control Compliance & ADA Renovations, Phase II

Phase II Animal Care & Control renovations will address non-compliant issues per the NC Department of Agriculture and Consumer Services, Animal Welfare Section (NCDA&CS) Inspection reports issued in 2018, 2020, and 2021. Phase II will address renovations for separation of species, inadequate ventilation surfaces not impervious to moisture, slab repair, additional square footage for dog and cat housing, and if funding is available fencing and gate replacement for dog kennels. This phase also will address ADA Barrier renovations to meet international ADA code requirements.

The facility is located at 8315 Byrum Drive, near the airport. This facility is just under 30 years old and the renovations required are a direct response to the NCDA&CS inspection reports. Also, the project will incorporate renovations to address ADA barriers in the facility, such as door hardware, signs, plumbing, minor parking lot curbing, etc.

CMPD background checks will be required for all construction staff, vendors, and anyone occupying the site during construction and deliveries.