Specialized stormwater services
Archived solicitations link
FY2020A -https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1120
FY2020B
https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1121
FY2020C
https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1158
FY2020D
https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1159
Specialized stormwater services
This project will replace the signalized intersection of Tuckaseegee/Thrift/Berryhill with a roundabout.
This project will install sidewalk within the Peachtree Hills area in three (3) locations. The proposed sidewalk will be located along Peachtree Road from Oakdale Road to Crandon Drive, along the northeast side of Beam Lake Drive from Peachtree Road to an existing sidewalk connection 800ft east, and along the south side of Oak Drive from Oakdale Road to an existing sidewalk connection 0.25 miles east.
This project will be construct various small sidewalk and ramp improvements throughout the City of Charlotte.
Storm Drainage Improvement Project to address failing storm drainage systems in the following locations:
– 1301 Ranch Road (Council District 2),
– 1308 Interurban Avenue (Council District 2),
– 7259 Point Lake Drive (Council District 5),
– 1331 Kingscross Drive (Council District 6),
– 2114 Shadyview Drive (Council District 6),
– 2217 Archdale Drive (Council District 6), and
– 11143 Ballantyne Crossing Avenue (Council District 7).
Storm Drainage Improvement Project
Storm Drainage Improvement Project. The purpose and need for the Project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.
Storm Drainage Improvement Project. The purpose and need for the Project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.