Matheson Avenue Bridge Streetscape

This project will incorporate pedestrian, bicycle and bridge improvements on Matheson Avenue from North Tryon Street to Jordan Place. The project will include a westbound one-way bicycle path along the north side of Matheson Avenue and a two- way bicycle path and sidewalk along the south side. Both sides will include a three-foot buffer between the bicycle paths and the road.

Copy of 16th Street Streetscape Phase 2

This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.

Copy of 16th Street Streetscape Phase 2

This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.

16th Street Streetscape Phase 2

This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.

Copy of 16th Street Streetscape Phase 2 – DUPLICATE PLEASE ARCHIVE

This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.

Unspecified Water and Sewer Repairs

This contract covers on-call repairs for water and sewer systems throughout Charlotte Water’s collection and distribution areas. Work may include emergency mobilization for critical pipeline repairs and other maintenance activities. The contract ensures rapid response capabilities for unforeseen infrastructure issues.

Ashe Plantation WWTP – Phase II Upgrades

The Project consists of the demolition of the existing 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration, clarifiers), filters, generator, shed and select yard piping. The new infrastructure includes a new 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration), two clarifiers, pre-engineered office/lab building, generator and the associated yard piping, site work, electrical and instrumentation. This scope of work also includes the relocation of and existing 8” gravity sewer line.

Ashe Plantation Phase II Upgrades – Re-Advertisement for Bids

The Project consists of the demolition of the existing 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration, clarifiers), filters, generator, shed and select yard piping. The new infrastructure includes a new 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration), two
clarifiers, pre-engineered office/lab building, generator and the associated yard piping, site work, electrical and instrumentation. This scope of work also includes the relocation of and existing 8” gravity sewer line.

9th and College Storm Drainage Improvement Project

The 9th and  College Storm Drainage Improvement Project is located in Uptown Charlotte within the 9th Street Right-of- Way between North College Street and the CATS Blue Line Extension light rail. The project will upgrade and replace storm drainage, sanitary sewer, and water main infrastructure within this block of 9th Street. The project will also include sidewalk, hardscape, pavement, and pavement markings replacement.