Ashley Road Sidewalk

This project will construct sidewalk along the east side of Ashley Rd from Greenland Ave. to Alleghany St. The scope for this project will include an 8’ planting strip where feasible and 6’ sidewalk, driveway improvements, wheelchair ramps and minor curb adjustments to eliminate pinch points for bike lanes.

Site Improvements at Charlotte Water’s Field Operations, Zone 1 & 2

The Project consists of the repaving of two different Charlotte Water Facilities: Zone 1 which is located at 11609 Hord Drive Huntersville, NC 28078, and Zone 2 located at 5730 General Commerce Drive Charlotte, NC 28213. Zone 1 encompasses additional aspects besides the repaving, including a proposed storm drainage system, water and sanitary sewer extensions, and the enlargement of the existing detention pond. Zone 2 includes some storm drainage, curb and gutter, and concrete apart from the repaving.

Bryant Farms Sidewalk

“construction contract for sidewalk project sidewalk along Bryant Farms Road between Hawk Ridge Elementary School and Elm Lane. The total project length is approx. 1.02 miles

215 Poindexter Drive Storm Drainage Improvement Project

Storm Drainage Improvement Project. The purpose and need for the Project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.

7141 Star Valley Drive Storm Drainage Improvement Project

Storm Drainage Improvement Project. The purpose and need for the Project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.