This project will update the 2015 Water Master Plan. Charlotte Water seeks the services of a qualified engineering firm to perform a comprehensive Master Plan of the water supply and distribution system in the City of Charlotte and Mecklenburg County, develop a prioritized Capital Investment Plan and provide a continuous improvement plan.
Water and Sewer Design Consulting Services
For the supplemental design and project assistance in the completion of miscellaneous water and sewer projects. Services will be needed for an undetermined number of individual street main projects, of varying length, throughout Charlotte Water service area. (PS) Professional Services
Dukes Chlorine Dioxide Pipeline – Cancelled
This project is to install a new chlorine dioxide line from the Dukes Water Treatment Plant to the intake. The scope also includes the replacement of the existing chemical piping.
Zone 4 Field Operations Center (Construction Manager-at-Risk)
The proposed Zone 4 project will include a 36,000 sf operations center, approximately 20,000 sf of pre-engineered metal structures to house open storage, crew storage, raw materials bunkers, two (2) combination trucks, fabrication shop, and two (2) fleet maintenance bays. The project will also include demolition of existing facilities in a phased approach so as to minimally impact or impede current operations on the site. The project may also include roadway improvements to West Tyvola Road to increase accessibility to the site.
Rodgers Builders was selected as the Construction Manager at Risk (CMAR) for this project.
McDowell Roofs Package 3 – Cancelled
This project consists of replacing various roofs at the McDowell Creek Wastewater Treatment Plant. This package will potentially include the replacement of four separate roofs.
Sugar and Irwin UV Replacement – CANCELLED
This project is to replace the ultraviolet disinfection equipment at the Sugar Creek Wastewater Treatment Plant and the Irwin Creek WWTP. The scope of the work also includes the replacement of the effluent filter piping and valves in addition to concrete channel work.
– Cancelled as of 8/13/24
Sugar and Irwin UV Replacement – cancelled
This project is to replace the ultraviolet disinfection equipment at the Sugar Creek Wastewater Treatment Plant and the Irwin Creek WWTP. The scope of the work also includes the replacement of the effluent filter piping and valves in addition to concrete channel work.
This item was archived earlier
Ashe Plantation Phase II Upgrades – Re-Advertisement for Bids
The Project consists of the demolition of the existing 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration, clarifiers), filters, generator, shed and select yard piping. The new infrastructure includes a new 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration), two
clarifiers, pre-engineered office/lab building, generator and the associated yard piping, site work, electrical and instrumentation. This scope of work also includes the relocation of and existing 8” gravity sewer line.
Ashe Plantation WWTP – Phase II Upgrades
The Project consists of the demolition of the existing 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration, clarifiers), filters, generator, shed and select yard piping. The new infrastructure includes a new 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration), two clarifiers, pre-engineered office/lab building, generator and the associated yard piping, site work, electrical and instrumentation. This scope of work also includes the relocation of and existing 8” gravity sewer line.