This project consists of replacing various roofs at the McDowell Creek Wastewater Treatment Plant. This package will potentially include the replacement of four separate roofs.
Sugar and Irwin UV Replacement – CANCELLED
This project is to replace the ultraviolet disinfection equipment at the Sugar Creek Wastewater Treatment Plant and the Irwin Creek WWTP. The scope of the work also includes the replacement of the effluent filter piping and valves in addition to concrete channel work.
– Cancelled as of 8/13/24
Sugar and Irwin UV Replacement – cancelled
This project is to replace the ultraviolet disinfection equipment at the Sugar Creek Wastewater Treatment Plant and the Irwin Creek WWTP. The scope of the work also includes the replacement of the effluent filter piping and valves in addition to concrete channel work.
This item was archived earlier
Ashe Plantation Phase II Upgrades – Re-Advertisement for Bids
The Project consists of the demolition of the existing 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration, clarifiers), filters, generator, shed and select yard piping. The new infrastructure includes a new 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration), two
clarifiers, pre-engineered office/lab building, generator and the associated yard piping, site work, electrical and instrumentation. This scope of work also includes the relocation of and existing 8” gravity sewer line.
Ashe Plantation WWTP – Phase II Upgrades
The Project consists of the demolition of the existing 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration, clarifiers), filters, generator, shed and select yard piping. The new infrastructure includes a new 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration), two clarifiers, pre-engineered office/lab building, generator and the associated yard piping, site work, electrical and instrumentation. This scope of work also includes the relocation of and existing 8” gravity sewer line.
New South End Light Rail Station
The Charlotte Area Transit System (CATS) will construct a new LRT station along the LYNX Blue Line (South Corridor) approximately mid-way between the East/West Boulevard and New Bern Stations. The new station must operate and communicate as part of the overall Lynx Blue Line. Construction will take place while the Blue Line remains in service.
The City of Charlotte completed a study in 2019 to determine the feasibility of constructing a pedestrian crossing or a new station mid-way between the East/West Boulevard and New Bern Stations. Charlotte Area Transit System (CATS) determined a new station would best serve the project area. The study indicated two potential locations for the new station, and a final station site will be determined through this contract.
The new station will be designed to the same standards as the recently constructed LYNX Blue Line Extension (BLE) stations and will have the capacity to serve up to three Light Rail Vehicles (LRVs). Construction and testing must occur with minimal disruption to LYNX Blue Line revenue service.
PSR#1036
McKee Creek Tributary – Larkhaven GC Trunk Sewer – Cancelled
Project consists of approximately 6,700 linear feet (LF) of gravity sewer along McKee Creek Tributary.
McKee Road Water Main Extension – Cancelled
Water main extension will coincide with the extension of McKee Road to East John Street, and will consist of approximately 2 miles of 12-16″ pipe.
Elevated Storage Tank Engineering Services
The Project consists of designing multiple new elevated storage tanks ranging in size from approximately 1.5 MG to 3.0 MG. CLTWater intends for the selected Company to provide services for three elevated storage tanks. The selected firm would also be asked to evaluate the quality of additional existing storage tanks in the CLTWater system.