Water and Wastewater Roofing Replacement Packages 14 and 15 – CANCELLED

Roofing Replacement of various Wastewater Treatment Plants’ structures:   McDowell, Irwin,          Sugar Creek and McAlpine.  Replacement consists of complete tear off of existing roof down to substrate.  Minor mechanical and electrical relocation/replacement work will be performed, if necessary.  

  • Cancelled as of 8/13

Water and Wastewater Roofing Replacement Packages 14 and 15 – cancelled

Roofing Replacement of various Wastewater Treatment Plants’ structures:   McDowell, Irwin,          Sugar Creek and McAlpine.  Replacement consists of complete tear off of existing roof down to substrate.  Minor mechanical and electrical relocation/replacement work will be performed, if necessary.  

This item was archived earlier.

Water and Wastewater Roofing Replacement Packages 12

Roofing Replacement of various Water Treatment Plants and Lift Stations. The Project consists of replacing roofing systems at Sharon Repump Station, Hoskins Booster Pump Station, and Plaza Booster Pump Station, as well as removing existing skylight and install clerestory and roof structure at Plaza Booster Pump Station and replacing the skylight at Idlewild Booster Pump Station. complete tear-off of the existing roof down to the substrate.  Minor mechanical and electrical relocations and re-hook-ups are required.

McDowell Roofs Package 3 – Cancelled

This project consists of replacing various roofs at the McDowell Creek Wastewater Treatment Plant.  This package will potentially include the replacement of four separate roofs.

Airport Roof Replacement and Repairs

Charlotte Douglas International Airport (CDIA) has responsibility for maintenance and repair of approximately one hundred (100) buildings including the airport terminal. CDIA requires a minimum of two on-call contractors to perform repairs, replacement and emergency roof repairs of these facilities.

The selected contractors will enter into a time and materials contract for on-call roof replacement and repair services on an as needed basis. The contract will include a three (3) base years and two (2) optional one-year (I) terms for a total potential contract period of five (5) years. The work shall include the furnishing of all supervision, labor, materials, and services required to make the necessary repairs. Along with making repairs to roofs, the contractors shall be required to demolish and remove existing roof materials and dispose of all waste material.  Repairs shall be billed on an agreed upon hourly rate and percent mark-up on materials.