FY23 Water Service Replacement

This contract will be a work order based contract to provide construction services to Charlotte Water for the relocation or renewal of water services (3/4-inch and 1-inch), abandonment of small diameter water mains (12-inch and under), and installation of new water mains.  The contract will consist of an undetermined number of individual water services relocations and other work areas throughout Mecklenburg County that will be assigned by the Engineer.

Mallard Creek NPW/PW System Rehabilitation (Re-bid)

This project will provide maintenance on the Mallard Creek Water Reclamation Facility’s potable and non-potable water systems. Work on this project will include repairs to valves, valve collars, hydrants and the installation of an 8-inch non-potable water connection line. As part of the project, the existing non-potable water backflow preventer, associated accessories and FRP (fiberglass reinforced plastic) enclosure.

Rectangular Rapid Flashing Beacons Installation – REBID

The City of Charlotte is soliciting bids for the procurement of Rectangular Rapid Flashing Beacon (RRFB) Systems. The RRFB Systems will be placed at High‐Visibility Enhanced Crosswalk locations. This contract will include the purchase and installation of the flashing beacons systems.

Mallard Creek NPW/PW System Rehabilitation – CANCELLED

This project will provide maintenance on the Mallard Creek Water Reclamation Facility’s potable and non-potable water systems. Work on this project will include repairs to valves, valve collars, hydrants, and the installation of an 8-inch non-potable water connection line. As part of the project, the existing non-potable water backflow preventer, associated accessories, and FRP (fiberglass reinforced plastic) enclosure.

Rivergate Parkway Bridge

This project will install a bridge over Hoover Creek connecting two ends of Rivergate Parkway. The project will provide vehicular and pedestrian access between neighborhoods and local retail. The project amenities include: a new bridge, sidewalk, curb and gutter, milling, asphalt pavement, pavement markings and related activities.

Cross Charlotte Trail (XCLT)− Orr Rd to Rocky River Rd

This project will complete a new segment of XCLT approximately 2.0 miles in length, extending from Orr Road at Tryon Street to Rocky River Road. It is anticipated that the alignment will generally follow the Master Plan alignment.  The trail cross section will be narrower in some sections along Orr Road and will follow Toby Creek on the south side until reaching Rocky River Road where the XCLT connects to existing Toby Creek Greenway.

McCullough Streetscape Project

Originating from the Northeast Corridor Infrastructure (NECI) Program, this project proposes to provide a new street connection by extending McCullough Drive from North Tryon Street to the existing dead end at Ken Hoffman Drive. This project will include two travel lanes, planting strips, curb & gutter, asphalt milling and paving, storm drainage, utility relocation, erosion control, bike lanes, sidewalk, Post Construction Stormwater Ordinance (PCSO) underground storage vaults, and retaining wall improvements. This project will improve pedestrian and bicycle mobility between North Tryon Street and W.T. Harris Boulevard.

JW Clay Blvd. Streetscape

The project will widen sections of JW Clay Blvd to a four-lane cross section with left turn lanes, bike lanes, cycle track, sidewalk, and other improvements.

Monroe Road Multi Use Path (MUP)

The purpose of this project is to provide safer pedestrian conditions along Monroe Road from Eaton Road to McCullen Way. Currently, there are two active city projects in the vicinity of this project. This MUP will fill a key gap between these two projects, providing a safer and more connected route for pedestrians and cyclists.