Old City Hall – ADA Implementation

This solicitation will be used for addressing the physical barriers identified in the city’s ADA Transition Plan. Areas include but are not limited to; restrooms, water fountains, signage, handrails/guardrails, doors & hardware, main lobby service area, exterior sidewalks, parking, and striping.

Beatties Ford Sidewalk Phase 1

This project will improve the curbs, driveway, sidewalks and ramps for Beatties Ford Road between Russell Avenue and Lasalle Street. Concrete shall be 6-inch Portland cement, asphalt shall be two-inch course and four-inch intermediate course. Gravel shall be six-inch incidental stone. Limits of proposed slopes are indicated in the plans. The contractor shall maintain erosion control devices in accordance with the appropriate city and state erosion and sediment control ordinances. Contractor shall sawcut existing asphalt and/or concrete surfaces prior to removal unless otherwise directed by the engineer. Project length is 0.281 miles.

Firehouse #30 Replacement

Firehouse #30, currently located at 4707 Belle-Oaks Drive, near Charlotte Douglas Airport, is currently located in a house built in 1955 and needs extensive renovations. The facility is the only firehouse where crews must leave their living quarters to access their apparatus, as a result, in impacting response time.

Firehouse #30 design services with the use of Advance Planning funds will be utilized to build a replacement 3-bay 2-story firehouse to manage response volumes in the Beam Road/Airport area. The new facility will be approximately 14,000 square feet. The building will be located at 3019 Beam Road, directly across from the Police and Fire Academy, and the parcel ID number is 141-24-104. It is located in Council District 3. The firehouse design will be the same floor plan design as Hidden Valley Firehouse #45 (HVFH#45).  This project is also designated to be an all-electric firehouse and additional scope will be added.

Franklin Water Treatment Plant Clearwell Improvements

Charlotte Water is requesting bids for construction of the Franklin Water Treatment Plant Clearwell project. This project includes installation of large diameter (72 to 120 inch) pipes, valves, and fittings. It also includes constructing a new chemical feed system, including a new building, pumps, storage silos, and chemical piping.

Mallard Creek Road Intelligent Transportation System Project

The Mallard Creek Road ITS Project includes the installation of approximately 0.65 miles of fiber optic cable in new directionally bored and trenched conduit and aerial attachments to wood utility poles. This project includes the installation of 1 owner furnished traffic management camera. This project also includes fiber splicing and testing. The project limits are from Medical Plaza to Governor Hunt Drive in Charlotte, Mecklenburg County, NC.

FY23 Water Service Replacement

This contract will be a work order based contract to provide construction services to Charlotte Water for the relocation or renewal of water services (3/4-inch and 1-inch), abandonment of small diameter water mains (12-inch and under), and installation of new water mains.  The contract will consist of an undetermined number of individual water services relocations and other work areas throughout Mecklenburg County that will be assigned by the Engineer.

Mallard Creek NPW/PW System Rehabilitation (Re-bid)

This project will provide maintenance on the Mallard Creek Water Reclamation Facility’s potable and non-potable water systems. Work on this project will include repairs to valves, valve collars, hydrants and the installation of an 8-inch non-potable water connection line. As part of the project, the existing non-potable water backflow preventer, associated accessories and FRP (fiberglass reinforced plastic) enclosure.

Rectangular Rapid Flashing Beacons Installation – REBID

The City of Charlotte is soliciting bids for the procurement of Rectangular Rapid Flashing Beacon (RRFB) Systems. The RRFB Systems will be placed at High‐Visibility Enhanced Crosswalk locations. This contract will include the purchase and installation of the flashing beacons systems.

Mallard Creek NPW/PW System Rehabilitation – CANCELLED

This project will provide maintenance on the Mallard Creek Water Reclamation Facility’s potable and non-potable water systems. Work on this project will include repairs to valves, valve collars, hydrants, and the installation of an 8-inch non-potable water connection line. As part of the project, the existing non-potable water backflow preventer, associated accessories, and FRP (fiberglass reinforced plastic) enclosure.