Sugar Creek Road ITS – CANCELLED

This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. It will remove existing copper communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

Tuckaseegee Roundabout

This project will replace the signalized intersection of Tuckaseegee/Thrift/Berryhill with a roundabout.

Peachtree Hills Sidewalk

This project will install sidewalk within the Peachtree Hills area in three (3) locations. The proposed sidewalk will be located along Peachtree Road from Oakdale Road to Crandon Drive, along the northeast side of Beam Lake Drive from Peachtree Road to an existing sidewalk connection 800ft east, and along the south side of Oak Drive from Oakdale Road to an existing sidewalk connection 0.25 miles east.

Sidewalk Gaps and Ramps

This project will be construct various small sidewalk and ramp improvements throughout the City of Charlotte.

Ashley Road Sidewalk

This project will construct sidewalk along the east side of Ashley Rd from Greenland Ave. to Alleghany St. The scope for this project will include an 8’ planting strip where feasible and 6’ sidewalk, driveway improvements, wheelchair ramps and minor curb adjustments to eliminate pinch points for bike lanes.

Site Improvements at Charlotte Water’s Field Operations, Zone 1 & 2

The Project consists of the repaving of two different Charlotte Water Facilities: Zone 1 which is located at 11609 Hord Drive Huntersville, NC 28078, and Zone 2 located at 5730 General Commerce Drive Charlotte, NC 28213. Zone 1 encompasses additional aspects besides the repaving, including a proposed storm drainage system, water and sanitary sewer extensions, and the enlargement of the existing detention pond. Zone 2 includes some storm drainage, curb and gutter, and concrete apart from the repaving.

Bryant Farms Sidewalk

“construction contract for sidewalk project sidewalk along Bryant Farms Road between Hawk Ridge Elementary School and Elm Lane. The total project length is approx. 1.02 miles

Cross Charlotte Trail (XCLT)− Brandywine to Tyvola

The scope and purpose of this project is to complete the City’s 1.5-mile segment of the Cross-Charlotte Trail from the southern end of the existing greenway north of Brandywine Rd to where the County’s new segment begins on the north side of Tyvola Rd.