This unspecified contract will provide horizontal construction services on an as-needed basis to the Engineering Department. The work includes traffic control, erosion control, clearing and grading, drainage, milling, asphalt paving, pavement markings, retaining wall, concrete curb, sidewalk, driveways, pedestrian refuge island, and wheelchair ramps.
I-277 Rail Trail Bridge – Construction
This project will construct a pedestrian bridge over I-277 to connect South End to Uptown. The bridge will be located just west of the existing light rail bridge and will include aesthetic elements to create a signature design. It will also include a new pedestrian rail crossing on the Morehead landing area and will tie the Stonewall plaza into the existing light rail platform.
Backlot Trail
This project will install a 10-foot asphalt path that connects Park South Drive to Park Road. This will include two pedestrian signals.
Sandy Porter S Tryon Intersection Improvements
This project includes pedestrian safety and capacity improvements at the intersection of Sandy Porter and South Tryon Street. The project will add a left turn lane off of South Tryon onto Sandy Porter and install widened sidewalks.
Unspecified Water and Sewer Repairs
This contract covers on-call repairs for water and sewer systems throughout Charlotte Water’s collection and distribution areas. Work may include emergency mobilization for critical pipeline repairs and other maintenance activities. The contract ensures rapid response capabilities for unforeseen infrastructure issues.
Ashe Plantation WWTP – Phase II Upgrades
The Project consists of the demolition of the existing 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration, clarifiers), filters, generator, shed and select yard piping. The new infrastructure includes a new 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration), two clarifiers, pre-engineered office/lab building, generator and the associated yard piping, site work, electrical and instrumentation. This scope of work also includes the relocation of and existing 8” gravity sewer line.
Ashe Plantation Phase II Upgrades – Re-Advertisement for Bids
The Project consists of the demolition of the existing 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration, clarifiers), filters, generator, shed and select yard piping. The new infrastructure includes a new 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration), two
clarifiers, pre-engineered office/lab building, generator and the associated yard piping, site work, electrical and instrumentation. This scope of work also includes the relocation of and existing 8” gravity sewer line.
9th and College Storm Drainage Improvement Project
The 9th and College Storm Drainage Improvement Project is located in Uptown Charlotte within the 9th Street Right-of- Way between North College Street and the CATS Blue Line Extension light rail. The project will upgrade and replace storm drainage, sanitary sewer, and water main infrastructure within this block of 9th Street. The project will also include sidewalk, hardscape, pavement, and pavement markings replacement.
Storm Water Repair and Improvement FY2021-A
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.