This project will install single‐mode fiber optic cable installed in new directionally bored, hand-dug, and trenched conduit, existing conduit, and aerial attachments to poles. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment, and other related activities.
Erwin Road Intelligent Transportation System (ITS)
This project will install single‐mode fiber optic cable installed in new directionally bored, hand-dug and trenched conduit, existing conduit, and aerial attachments to poles. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment, and other related activities.
Tuckaseegee Road Intelligent Transportation System (ITS)
This project will install single‐mode fiber optic cable installed in new directionally bored, hand-dug and trenched conduit, existing conduit, and aerial attachments to poles. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment, and other related activities.
Freedom Drive Intelligent Transportation System (ITS)
This project will install single‐mode fiber optic cable installed in new directionally bored, hand-dug, and trenched conduit, existing conduit, and aerial attachments to poles. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment, and other related activities.
Field Operations Zone 2 Facility, Vacuum Truck Receiving Station
This project consists of constructing a new Vacuum Truck Receiving Station, a new canopy extension over existing concrete-walled material storage bays, and appurtenant facilities at the Charlotte Water Field Operations Operation Zone 2 Facility.
McAlpine 54″ Sanitary Sewer Rehabilitation Phase 4
The project consists rehabilitation of approximately 4,784 feet of 8-inch and 8,320 feet of 54-inch sanitary sewer via cured in-place pipe lining (CIPP) including all preparatory work such as sewer cleaning and television inspection, rehabilitation of connecting manholes as specified, bypass pumping of wastewater flows, and complete restoration.
|
FY22 Water/Sewer infrastructure Construction – Contract 1 – CANCELLED
Cancelled – there is not an annual contract for this need for FY22
FY22 Water/Sewer infrastructure Construction – Contract 2 – CANCELLED
Canceled – there is not an annual contract for this need for FY22
Biosolids Thermal Hydrolysis Process Design Build Project
Charlotte Water intends to implement the Thermal Hydrolysis Process (THP) and other biosolids treatment improvements at the McAlpine Creek Wastewater Management Facility (WWMF) utilizing the Progressive-Design-Build delivery method to create a sustainable, regionalized, diversified, and resilient biosolids management program. The project will include the design and construction of multiple facilities at the McAlpine Creek WWMF including a Pre-Dewatering building with associated process equipment, screened sludge storage tanks, THP systems as furnished by CAMBI, improvements to the existing anaerobic digester complex including steam boilers, replacement odor control facility, sidestream deammonification treatment, electrical distribution system improvements, and other ancillary components.