This contract project provides construction and installation of small diameter water and sewer service connections. These service connections are applied and paid for by external customers and installed by the Charlotte Water contractor.
FY26 Water Main Replacement Bid Package
Charlotte Water is seeking a construction contractor. This contract will be for the construction of multiple defined small water main replacement projects in neighborhoods totaling approximately 25,000 LF of 2-, 6-, 8-, and 12-inch main replacement.
McDowell WWTP UV Disinfection Improvements
This project includes replacing all the components of the existing UV system at McDowell Wastewater Treatment PLant. This will also require temporary disinfection capabilities throughout the installation of the new UV system.
Franklin WTP 24 MOD Improvements
This project will include the installation of 39 new valves inside of the 24 MOD. The existing valves have reached their useful life. These valves have been purchased separately by Charlotte Water.
Irwin Creek WWTP UV Disinfection Improvements
This project includes replacing all the components of the existing UV system at Irwin Creek Wastewater Treatment Plant. This will also require temporary disinfection capabilities throughout the installation of the new UV system.
McDowell WWTP Headworks Improvements
This project will include the replacement of the 30″ influent pump station knife gate valves at the discharge header with new plug valves. Additional piping that is failing will need to be replaced along with valve actuators and electrical components. Replacement of malfunctioning gates will also need to be replaced.
Lee Dukes Alum Bulk Storage Replacement
This construction contract is for the replacement of the Alum Bulk Storage tanks at the Lee Dukes Water Treatment Plant. The project will also include replacement of the existing piping between the day tanks and the bulk storage and the piping between the bulk storage tank to the delivery fill location.
Irwin Creek WWTP Stormwater Improvements Project
This construction contract will replace existing diesel pumps with electric submersible pumps. This will be done at three locations at the existing stormwater outfall locations. The project will also include installation of permanent discharge piping at stormwater outfall 1. This will require electrical duct bank along with wiring and all necessary components to power the pumps.
Lee Dukes Chemical Feed Piping Replacement
This construction contract will be for the replacement of the chemical feed piping at the Lee Dukes Water Treatment Plant. The piping replacement will pertain primarily to the chlorine feed system and the alum feeds.