Beaverdam Creek Trunk Sewer – Phase 2 – CANCELLED

This project consists of the design and construction of a gravity outfall along Beaverdam Creek West Branch. This outfall is a tributary to the existing Beaverdam Creek Lift Station and Force Main. Phase 2 is approximately 2,100 linear feet of pipe and will continue from the anticipated Phase 1 West Blvd extension north to a terminus near I-485. This project will accommodate economic growth in the River One area by expanding the wastewater collection system.

Cancelled as of 1/18/2024

FY25 Street Mains Extensions Contract 1 – CANCELLED

This contract will be for the construction of an undetermined number of street mains extensions and miscellaneous infrastructure projects. This contract will also provide construction assistance on an as needed basis for other capital projects. This contract will cover Charlotte Water’s entire service area.

Cancelled as of 3/25/2024.

FY24 Street Mains Extensions Contract 2 – CANCELLED

This solicitation will be for the construction of an undetermined number of street main extensions and miscellaneous infrastructure projects. This contract will also provide construction assistance on an as-needed basis for other capital projects. This contract will cover Charlotte Water’s entire service area.

Cancelled as of 3/25

960 East/West Water Main

Project of approximately 16,000 Linear Feet of 36 inch water main along Albemarle Rd.  This project improves the water transmission capacity in the 960 pipe zone.  Project is in final design, permitting and easement acquisition.

Zone 3 Stomwater and Site Improvements

This construction will improve site conditions at the Zone 3 Field Operation facility. Construction work will include stormwater settling basins, stormwater conveyance, and various site improvements. The design is already complete.

Elevated Storge Tank #2 – Woodlawn

Construction of the second elevated storage tank at the Woodlawn site if there is sufficient funding after starting construction on the first elevated storage tank (Sunset Road). The second elevated storage tank has a capacity of three million gallons. The project is fully designed and permitted.

McAlpine Preliminary and Primary Treatment Construction Package #1

Provides for rehabilitation of Preliminary and Primary Treatment Facilities. Facilities generally include headworks, flow equalization basins, primary clarifiers, and gravity thickeners. A facilities evaluation, conducted by the design team, will determine the final scope of work.

FY24 Water/Sewer Infrastructure Construction – Contract 3

This contract consists of an undetermined number of individual projects consisting of water and/or sewer extensions, water and/or sewer replacements, low-pressure sanitary sewer, water distribution system reliability improvement projects, and/or sanitary sewer capacity assurance projects, which will be assigned by the Project Engineer.

FY24 Water/Sewer Infrastructure Construction – Contract 2

This contract consists of an undetermined number of individual projects consisting of water and/or sewer extensions, water and/or sewer replacements, low pressure sanitary sewer, water distribution system reliability improvement projects, and/or sanitary sewer capacity assurance projects, which will be assigned by the Project Engineer.