Storm Water Services is soliciting Statement of Qualifications from a qualified engineering companies to provide an engineered solution for various drainage issues in an existing conditions environment where existing drainage systems have failed or flooding conditions have developed and require improvement, replacement, rehabilitation, or repair treatments that meet City practices and standards. This includes, but is not limited to, initial assessment of the existing condition, concept plan development, preparation of design plans, calculations, construction estimates, bidding documents, and other items necessary to resolve reported drainage issues. In addition, participation and attendance may be required for utility coordination meetings, preconstruction meetings, construction warranty observation field meetings at 6 and 11 months intervals, and other meetings necessary to deliver each engineered solution, and address redlined comment.
New Bern Drainage Replacement Project
This project is comprised of the installation of a new culvert crossing across the light rail alignment, located between New Bern Station and Poindexter Rd.
PSR # 1695
River District Firehouse – Phase 1
Scope Statement: CFD plans to build a temporary firehouse for the newly developed River District to manage response volumes in the area. The firehouse will be located on Dixie River Road, near the future Catawba Crossing, on parcel number 14128101.
The Phase 1 facility will be (1) triple wide trailer to house the firemen and a pre-engineered building to serve as an apparatus bay to house the fire engine and emergency equipment.
This location and site selection meets the City of Charlotte Policy for Sustainable City Facilities and Charlotte Fire Department Facilities Master Plan.
Firehouse # 46 Infill Station at Miranda Road
A new infill firehouse will be designed and constructed at 4032 Miranda Road to alleviate high call volumes and meet response time standards in the area. The firehouse will reflect the design of Firehouse #45, a 3-bay, 2-story firehouse programmed for approximately 14,600 square feet. The proposed facility will be located at the corner of Beatties Ford Road. Parcel #03741123 is approximately 6.54 acres. This location and site selection meets the City of Charlotte Policy for Sustainable City Facilities and Charlotte Fire Department Facilities Master Plan.
Wharton-Smith has been awarded CMAR services and is working on prequalifying subcontractors for the project.
Miranda Road Firehouse 46
A new infill firehouse will be designed and constructed at 4032 Miranda Road to alleviate high call volumes and meet response time standards in the area. The firehouse will reflect the design of Firehouse #45, a 3-bay, 2-story firehouse programmed for approximately 14,600 square feet. The proposed facility will be located at the corner of Beatties Ford Road. Parcel #03741123 is approximately 6.54 acres. This location and site selection meets the City of Charlotte Policy for Sustainable City Facilities and Charlotte Fire Department Facilities Master Plan.
University City Blvd Pedestrian Crossings
This Project will install 270 LF of proposed 12′ wide multi-use-path, curb ramps, crosswalks across NC 49, Pedestrian concrete island, milling/resurfacing, storm drainage and pedestrian hybrid beacon with mast arms near the intersection of University Blvd and Mark Twain Road. This project will also install pedestrian crossings, wheelchair ramps, traffic signals milling/resurfacing and storm drainage system at the intersection of University City Blvd and Suther Rd.91347
North Tryon St Left Turn Lane at University City Blvd
The purpose of this project is to improve traffic flow on North Tryon Street by extending the left turn lane. This project will include lane widening, drainage and pavement markings.
Sardis Road North Sidewalk
This project will provide new sidewalk along Sardis Road North from Sardis Road to westernmost intersection of Rittenhouse Circle and Sardis Road North. Project length = 0.5 miles.
This project will include the following:
6′ Sidewalk
8′ Planting Strips
2′-6″ Curb and Gutter
Street Trees
Concrete Ped Refuge Island (between Kilcullen Dr. and Rittenhouse Circle)
Concrete Bus waiting pads
Retaining Walls
Curb Ramps
Storm Drainage
McAlpine WWTP Biosolids Treatment Facility Reliability
This will be an Invitation to Bid for Charlotte Water. This project will involve the rehabilitation of Biosolids Treatment Facilities. Facilities generally include digesters, digester control buildings, biogas conditioning facilities, digested sludge storage tanks, and dewatering buildings.