Collective AB Storm Drainage Improvement Project

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential, and commercial properties.

Craighead/Tryon Storm Drainage Improvement Project

The Craighead/Tryon Storm Drainage Improvement Project is bordered by Glory Street to the north, Little Sugar Creek to the south, Sugar Creek Road to the east and Craighead Road to the west. The existing drainage system consists of pipe system under city-maintained road, state-maintained road, and private property. The improvements include pipe system upgrades.

Firehouse #30 Replacement

Firehouse #30, currently located at 4707 Belle-Oaks Drive, near Charlotte Douglas Airport, is currently located in a house built in 1955 and needs extensive renovations. The facility is the only firehouse where crews must leave their living quarters to access their apparatus, as a result, in impacting response time.

Firehouse #30 design services with the use of Advance Planning funds will be utilized to build a replacement 3-bay 2-story firehouse to manage response volumes in the Beam Road/Airport area. The new facility will be approximately 14,000 square feet. The building will be located at 3019 Beam Road, directly across from the Police and Fire Academy, and the parcel ID number is 141-24-104. It is located in Council District 3. The firehouse design will be the same floor plan design as Hidden Valley Firehouse #45 (HVFH#45).  This project is also designated to be an all-electric firehouse and additional scope will be added.

Field Operations Pipeline Rehabilitation Construction

This bid package is a collection of projects to increase potable water system reliability and replace aging infrastructure. Work consists of approximately 15,000 linear feet of potable water line construction for 2-, 6-, and 8-inch pipe, and associated repair or replacement of asphalt pavement, concrete sidewalk, curb ramps, curb & gutter, and minor lawn/landscape restoration, primarily within CDOT and NCDOT right-of-way.

Gaynelle Storm Drainage Improvement Project

This project is located on Gaynelle Drive between Langley Circle and Running Wood Lane. The existing drainage system consists of open channel and a culvert under a city-maintained road. The culvert system is experiencing blockages and is prone to flooding.

Collective T Storm Drainage Improvement Project

Collective Storm Drainage Improvement Project (SDIP) Series T contains five separate storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork,
drainage structures (standard and non-standard), storm drainpipe systems, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, water and sewer (relocations, installations and adjustments), foundation protection and any other associated work required by the Engineer. Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.

CLT Center Storm Drainage Project

This project is located in a parking lot behind the CLT Center located at 5601 Wilkinson Boulevard in Charlotte, NC.  The purpose of the project is to install new pipe to contain and drain runoff from the building to an existing storm drainage system at the rear of the parking lot.  The work involves installation of reinforced concrete pipe, storm drainage structures, asphalt surface, and re-striping the parking lot within the construction corridor.

FY24 Small Diameter Water/Sewer Service Contract #1

This contract is for water and sanitary sewer service installations, including connection to the existing public main, which extends a small diameter line to the property, and includes a water meter box or sanitary sewer clean out. Customers pay connection fees for the installation service, which is based on costs incurred by Charlotte Water in these contracts. The work covered by this contract will provide approximately 900 total services.

On Call Stream Restoration and Sanitary Sewer Repair

This project includes stream stabilization and sewer repair at multiple locations within the sanitary sewer collection system. Stream stabilization structures shall be constructed to protect existing and proposed sanitary sewer infrastructure.

Project components include natural in-stream structures, plantings, site grading, sanitary sewer replacement, sheet pile installation, bypass pumping and sediment control measures. Site locations will be released during the contract duration.

The contract is expected to be for a two-year term with possible renewal.