Sandy Porter S Tryon Intersection Improvements

This project includes pedestrian safety and capacity improvements at the intersection of Sandy Porter and South Tryon Street. The project will add a left turn lane off of South Tryon onto Sandy Porter and install widened sidewalks.

Unspecified Water and Sewer Repairs

This contract covers on-call repairs for water and sewer systems throughout Charlotte Water’s collection and distribution areas. Work may include emergency mobilization for critical pipeline repairs and other maintenance activities. The contract ensures rapid response capabilities for unforeseen infrastructure issues.

Ashe Plantation WWTP – Phase II Upgrades

The Project consists of the demolition of the existing 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration, clarifiers), filters, generator, shed and select yard piping. The new infrastructure includes a new 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration), two clarifiers, pre-engineered office/lab building, generator and the associated yard piping, site work, electrical and instrumentation. This scope of work also includes the relocation of and existing 8” gravity sewer line.

Ashe Plantation Phase II Upgrades – Re-Advertisement for Bids

The Project consists of the demolition of the existing 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration, clarifiers), filters, generator, shed and select yard piping. The new infrastructure includes a new 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration), two
clarifiers, pre-engineered office/lab building, generator and the associated yard piping, site work, electrical and instrumentation. This scope of work also includes the relocation of and existing 8” gravity sewer line.

FY21 WATER SEWER INFRASTRUCTURE – CONTRACT 1

This contract consists of an undetermined number of individual projects consisting of water and/or sewer extensions, water and/or sewer replacements, low pressure sanitary sewer, water distribution system reliability improvement projects, and/or sanitary sewer capacity assurance projects, which will be assigned by the Project Engineer.

FY21 WATER SEWER INFRASTRUCTURE – CONTRACT 2

This contract consists of an undetermined number of individual projects consisting of water and/or sewer extensions, water and/or sewer replacements, low pressure sanitary sewer, water distribution system reliability improvement projects, and/or sanitary sewer capacity assurance projects, which will be assigned by the Project Engineer.

FY21 Water Main Replacement Contract 3

This contract consists of an undetermined number of individual projects consisting of water and/or sewer replacements, water and/or sewer extensions, and water distribution system reliability improvement projects, which will be assigned by the Project Engineer.

2831 Flintridge Drive Storm Drainage Improvement Project

The 2831 Flintridge Drive Project will include the replacement of approximately 340LF of 48″ CMP with new 7’x3′ RCBC between open drainage channels behind 2831 and 2816 Flintridge Drive. The 7’x3′ RCBC installation will vary between 9-14 feet deep and will require active shoring approved by a professional engineer.