4th Parallel Runway Runway Package 1: Taxiway V and Connectors

The first phase of constructing the Fourth Parallel Runway at CLT is the southward extension of existing Taxiway V and construction of related connector taxiways.  The project includes demolition, erosion and sedimentation control, grading, drainage, airfield concrete and asphalt paving, marking, fencing, and airfield lighting/signage.  The new taxiway will meet FAA Taxiway Design Group (TDG) 5 requirements.

Catawba Pump Station Rehabilitation Project

The Project site is the Catawba Raw Water Pump Station located on Mountain Island Lake, owned & operated by Charlotte Water. The site address is 12548 Pump Station Rd, Charlotte, NC 28216. The work under this project will be primarily in Cells #2 & 3. The electrical work consists of changing the Cell #3 voltage from 2300V to 4160V, including new switchgear, synchronous motor, conduit, cable, etc. as well as re-winding an existing electric pump motor. The civil/mechanical work consists of rebuilding/replacing screens, rehabbing cone valves, and installing a new flow meter vault. The structural work consists of new electrical vault, drywall electrical room, masonry, doors, windows, louvers, and fans. This project also includes upgrades to the fire alarm system for the entire Catawba Pump Station facility.