This project consists of constructing one new elevated storage tank 2 MG (million gallons in size). There will be waterline work associated to extend the mainline to the tank site. The selected firm would be asked to provide clearing and grading services in preparation of the tank installation.
Vest Water Treatment Plant to Franklin Water Treatment Plant Force Main and Lee Duke Water Treatment Plant Chem Feed Improvements
The Project consists of two scopes of work.
Scope 1: Vest Water Treatment Plant to Franklin Water Treatment Plant Force Main consists of installing over 16,000 linear feet of 16” ductile iron piping force main for residual and backwash transfer between the Vest Water Treatment Plant and the Franklin Water Treatment Plant. Installation of all associated fittings, valves, air release valves, trenching, trenchless crossings, parallel future piping, paving, connections, corrosion control, erosion control, cleaning, testing, and all other associated pipeline work. Installation of two crossings at CSX railroad and NCDOT I-85 Interstate, consisting of parallel 16” ductile iron carrier pipe inside single casing. Reporting on material of service connections along alignment and replacing galvanized steel service lines where discovered. Scope 2: Lee S Dukes High Density Polyethylene (HDPE) Pipeline consists of the installation of 6,000 LF of new 3-inch x 6-inch diameter double wall containment pipe for new chlorine dioxide chemical feed system, including all appurtenances, leak detection system, electrical, testing, and final commissioning. Installation of two (2) new 2-inch diameter HDPE raw water sample lines (approximate length is 6,000 LF for each), including all appurtenances, and testing. Installation of a new raw water sample pump, casing, piping, appurtenances, electrical, and testing at the Raw Water Intake at Blythe Landing. Removal and replacement of various chemical feed lines (11/2-inch and 4-inch diameter) inside existing 8-inch and 12-inch diameter casing pipes. Installation of new fiber optic cable (approximately 6,000 LF) between the Lee S. Dukes WTP and the Raw Water Intake. Installation of new potable water line from Highway 73 to existing Compressor Building, including all appurtenances, and testing. |
FY23 Water and Sewer Infrastructure – Contract 1
This contract will provide for new water and sanitary sewer main construction throughout the Charlotte, NC water service area. The majority of this contract will be used to build projects for the Street Main Extension Program.
Briar Creek and Paw Creek Sewer Rehabilitation
This project consists of the sanitary sewer rehabilitation of approximately 13,500 linear feet of sewer outfall with cured-in-place lining. This project will extend along the Briar Creek and Paw Creek outfalls. A 112 linear feet 24-inch diversion sewer will also be constructed under Briar Creek along with a 118 linear feet 8-inch linear feet collector sewer.
FY23 Small Diameter Water/Sewer Service Contract #2 (Re-bid)
This contract is for water and sanitary sewer service installations including connection to the existing public main, which extends a small diameter line to the property. Additionally, a water meter box or sanitary sewer cleanout is included. Customers pay connection fees for the installation service, which is based on costs incurred by Charlotte Water in these contracts. The work covered by this contract will provide approximately 800 total services.
Bonlyn Storm Drainage Improvement Project
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, and channels. Work could also include working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within the street right-of-way or within storm drainage easements.
Redman Road SDIP
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, and channels. Work will also include working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within the street right-of-way or within storm drainage easements.
Storm Water Repair and Improvement FY2023-F
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve: mobilization, earthwork, drainage structures, storm drain pipe systems, and channels. Additional work will include: working over, under, near, and around existing private utilities, asphalt paving concrete flatwork, landscaping, and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within the street right-of-way.
Storm Water Repair and Improvement FY2023-E
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve: mobilization, earthwork, drainage structures, storm drain pipe systems, and channels. Additional work will include: working over, under, near, and around existing private utilities, asphalt paving concrete flatwork, landscaping, and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within the street right-of-way.