Elevated Water Storage Tanks (Cancelled)

This project consists of constructing two new elevated storage tanks. The first tank will be called the Woodlawn Tank with a size of 3 MG (million gallons).    The second tank will be called the Sunset Tank with a size of 2 MG (million gallons). There will be waterline work associated to extend the mainlines to the tank site. The construction site will require grading and clearing in preparation of the tank installation.

CMGC Electric Vehicle Charging Stations Project

This project is for the purchase and installation of up to twenty-five electric vehicle charging stations for the Charlotte-Mecklenburg Government Center (CMGC) Parking Deck. Scope includes all electrical infrastructure work including but not limited to electrical panels, conduits, and concrete work.

McAlpine 54″ Sanitary Sewer Rehabilitation Phase 4

The project consists rehabilitation of approximately 4,784 feet of 8-inch and 8,320 feet of 54-inch sanitary sewer via cured in-place pipe lining (CIPP) including all preparatory work such as sewer cleaning and television inspection, rehabilitation of connecting manholes as specified, bypass pumping of wastewater flows, and complete restoration.

Biosolids Thermal Hydrolysis Process Design Build Project

Charlotte Water intends to implement the Thermal Hydrolysis Process (THP) and other biosolids treatment improvements at the McAlpine Creek Wastewater Management Facility (WWMF) utilizing the Progressive-Design-Build delivery method to create a sustainable, regionalized, diversified, and resilient biosolids management program. The project will include the design and construction of multiple facilities at the McAlpine Creek WWMF including a Pre-Dewatering building with associated process equipment, screened sludge storage tanks, THP systems as furnished by CAMBI, improvements to the existing anaerobic digester complex including steam boilers, replacement odor control facility, sidestream deammonification treatment, electrical distribution system improvements, and other ancillary components.

N Davidson St 2401 Storm Drainage Improvement Project

The existing pipes at the intersection of N Davidson St and 27th St were determined to be in very poor condition. This project will replace the existing three (3) pipes with one (1) large RCP culvert from the intersection of 27th St and N Davidson St, to the headwall located on the north side of N Davison St.

FY23 Small Diameter Water/Sewer Contract #1

This contract is for water and sanitary sewer service installations including connection to the existing public main, which extends a small diameter line to the property, and includes a water meter box or sanitary sewer cleanout. Customers pay connection fees for the installation service, which is based on costs incurred by Charlotte Water in these contracts. The work covered by this contract will provide approximately 800 total services.

FY23 Small Diameter Water/Sewer Service Contract #2

This contract is for water and sanitary sewer service installations including connection to the existing public main, which extends a small diameter line to the property.  Additionally, a water meter box or sanitary sewer cleanout is included. Customers pay connection fees for the installation service, which is based on costs incurred by Charlotte Water in these contracts. The work covered by this contract will provide approximately 800 total services.