Asphalt Taxiway & Runway Improvements (Construction)

This project is related to on-going maintenance and repair project for asphalt pavement around the Airport’s Airfield, including runways and taxiways. The typical scope of work involves milling and resurfacing heavily-used areas of runways and taxiways, which will usually involve working during night-time hours, in order to minimize impacts to Airport Operations,

Central Energy Plant (Construction)

The Central Energy Plant is part of the Terminal Lobby Expansion Construction Management at Risk Project.

Provide construction services for a new central energy plant to be located on the first level. The central energy plant will be for the New Terminal Expansion, but will also include space for current and future infield development.

Centralized Receiving and Distribution Center (Construction)

Construct a new Centralized Receiving and Distribution Center (CRDC) on the south side of the airport.  CRDC will provide additional receiving and distribution space to support the growing delivery  operations for the airport, reducing the overall vendor traffic  in the terminal.

Project Management Services

The Charlotte-Douglas International Airport (CLT) is seeking to engage the services of a qualified Aviation Consultant to provide Project Management (PM) Services for various projects. These projects may include, but are not limited to airfield/civil works, passenger handling facilities and other aviation support facilities, such as; Terminal Lobby Expansion, Central Energy Plant, Federal Inspection Station Renovations, , Concourse A Expansion Phase 2, Terminal and Concourse Renovations, Atrium and Terminal Life Safety
Enhancements, E Concourse Expansion Phase 9, Tenant (Concession and Retail) Renovations, and new runway and taxiways and associated work, major utility infrastructure work, roads and bridges, airfield lighting and Navigation Aids, fire stations, and cargo and catering building improvements.

Joint Sealant Improvements

Remove and replace the joint sealant in the concrete pavement in the following locations: Runway 18R-36L, Taxiway W (and associated taxiways), Taxiway N, Taxiway S, and Taxiway V (and associated taxiways).

Airport North End Around Taxiway (NEAT) Overlook Relocation – Construction

The NEAT Overlook Relocation includes the construction of a new Airport Overlook Drive, installation of a sanitary sewer force main routed along the west side of the new Airport Overlook Drive continuing to a septic field located easterly of the intersection with Old Dowd Road, a 683 square foot restroom building with utility service, a 145-vehicle paved and lighted parking area, a bus/food truck parking area, picnic tables, benches, and an open recreation area within a 4.23 acre fenced site.

Taxiway M Rehabilitation (Construction)

This project scope includes rehabilitating the existing pavement concrete of two taxiways. Additional work related to the taxiway rehabilitation includes airfield lighting and signage replacement, grading, drainage, temporary sediment and erosion control measures, and pavement markings.