Ashley Road Sidewalk

This project will construct sidewalk along the east side of Ashley Rd from Greenland Ave. to Alleghany St. The scope for this project will include an 8’ planting strip where feasible and 6’ sidewalk, driveway improvements, wheelchair ramps and minor curb adjustments to eliminate pinch points for bike lanes.

Sugar & Irwin WAS Equalization Tanks at McAlpine – Cancelled

Proposed project is to fund a new 31,000 gallon above-equalization grade tank to receive the waste activated sludge (WAS) pumped from Sugar Creek Wastewater Treatment Plant, a new 25,000 gallon equalization tank to receive WAS from Irwin Creek Wastewater Treatment Plant and potentially a new additional 30,000 gallon equalization tank to receive WAS from Long Creek.

Site Improvements at Charlotte Water’s Field Operations, Zone 1 & 2

The Project consists of the repaving of two different Charlotte Water Facilities: Zone 1 which is located at 11609 Hord Drive Huntersville, NC 28078, and Zone 2 located at 5730 General Commerce Drive Charlotte, NC 28213. Zone 1 encompasses additional aspects besides the repaving, including a proposed storm drainage system, water and sanitary sewer extensions, and the enlargement of the existing detention pond. Zone 2 includes some storm drainage, curb and gutter, and concrete apart from the repaving.