This construction project is located just east of downtown along an unnamed tributary to Little Sugar Creek on Louise Ave. The purpose and need for the project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.
FY21-1 Sanitary Sewer Rehabilitation
This contract will be primarily used to repair sewer system defects that are allowing substantial rainwater and ground water (inflow and infiltration) to enter the sewer system. The contract will also be used to repair significant structural defects that are causing re-occurring maintenance issues .
Sanitary Sewer Point Repair and Replacements
This contract is for the rehabilitation of manholes, repair of sewer system defects and service laterals, installation of new sewers and manholes to replace existing, installation of cured-in-place pipe lining, pipe bursting, other miscellaneous manhole rehabilitation work, and all preparatory work such as sewer cleaning and television inspection.
Atrium Life Safety and Rehabilitation (Construction)
The Terminal Atrium Life Safety and Renovation Project will include the installation of fire protection and life safety systems in the Atrium and Mezzanine. The project will also include refurbishing finishes, new flooring, upgraded lighting, and signage and wayfinding. There will also be addition of life safety measures and renovations to various other components in the Atrium portion of the Terminal Building.
Terminal Basement Rehabilitation (Cancelled)
The Airport plans to rehabilitate the existing terminal basement as it has not been renovated since its original construction in the 1980s. The Terminal Basement currently provides three prep kitchens in addition to storage for concessionaires in the terminal. The rehabilitation will reconfigure the space to maximize the operation and update all life safety systems for this area.
Sharklets on the C Concourse – CANCELLED
Scope of Work Construction of Sharklets Concourse C
The Airport is working with American Airlines (AA) to determine needs related to AA’s aircraft fleet mix. The Airport is awaiting a decision from AA as to whether or not AA is going to sign a reimbursable agreement for the necessary planning, design, and construction to accommodate their A321 aircraft with extended wingtips (Sharklets) on the C Concourse.
This project has been cancelled.
Concourse E Renovations (Construction)
The Concourse E Expansion project will add a 31,000 square foot expansion to the concourse to provide facilities for the additional passenger load. The expansion will also include additional passenger hold rooms, public restrooms, and passenger loading bridges.
Wide Body Gate Upgrades – CANCELLED
SOW Upgrading gates for Transportation Services.
Cancelled – This project was consolidated into the Private Access Drive – Construction project.
Phase 2 of Private Access Drive – CANCELLED
SOW Construction of Access Drive
Cancelled – This project was consolidated into the Private Access Drive – Construction project.