charlotte-water-bluet  Charlotte Water / Construction

Mallard Water Reclamation Upgrades, Phase 1 Improvements

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon

Posting Number 2021-Q1(Jan-Mar)-CW-3601

Anticipated Posting Date 2021-02-04

Commodity Code(s): 91200

Solicitation Link: https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1595

The Phase 1 Water Reclamation Upgrade will increase the capacity of the facility to 14.9 million gallons per day (MGD) and includes a new deeper influent pump station to accept flow from a new, deeper trunk sewer, flow equalization, influent screens, aeration control and chemical feed.  The estimated construction cost for this upgrade is $65.2 million. The Phase 1 construction project will also include solids improvements that are estimated at $24 million.  Both aspects of the project will be delivered together as a single construction project.

Requirements

Last Updated: 02/04/21
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Abby Dolan

City Contact

adolan@charlottenc.gov