CMPD Animal Care and Control Phase 3 Expansion

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2024-04-30 2024-04-30 CMPD Animal Care and Control Phase 3 Expansion

The purpose of the CMPD Animal Care and Control, Phase 3 Expansion project is primarily to provide additional kennels for dogs and reduce the increasing rate of euthanasia.  Secondly, to provide additional space for other animals and improve the efficiencies of operations for the facility.  The expansion of the facility will possibly be located at 2700 Toomey Avenue and the parcel is currently 4.67 acres. This is the old location for the Animal Humane Society.  We are currently in the advanced planning phase to acquire a schematic design to confirm the estimated construction cost.

The Construction delivery system will be Progressive Design Build. It is also anticipated that the city will acquire an Owner’s Advisor to assist with procurement and additional services during design and construction.

Posting Number 04 2024-Q2(Apr-Jun)-DGS-14059

Anticipated Posting Date 2024-04-30

Commodity Code(s): 91200, 91219, 91244, 91319, 91345, 91347, 91430, 91438, 91450, 91455, 91473, 91479, 98815, 98852

The purpose of the CMPD Animal Care and Control, Phase 3 Expansion project is primarily to provide additional kennels for dogs and reduce the increasing rate of euthanasia.  Secondly, to provide additional space for other animals and improve the efficiencies of operations for the facility.  The expansion of the facility will possibly be located at 2700 Toomey Avenue and the parcel is currently 4.67 acres. This is the old location for the Animal Humane Society.  We are currently in the advanced planning phase to acquire a schematic design to confirm the estimated construction cost.

The Construction delivery system will be Progressive Design Build. It is also anticipated that the city will acquire an Owner’s Advisor to assist with procurement and additional services during design and construction.

Requirements

Last Updated: 04/10/24
Insurance Requirements+
Bonding Requirements+
Subcontracting Opportunities+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Bruce Miller

City Contact

bemiller@charlottenc.gov