This project will be to obtain a contract with a company that will provide full comprehensive inspection, testing, maintenance, training, and repair services for fire extinguishers for Charlotte Water facilities.
Water Treatment Valve Rehabilitation Services
Charlotte Water will be seeking a company to inspect Charlotte Water (Water Treatment division) valves for rehabilitation needs in order to maintain their operational status and minimize downtime. Valves will be disconnected and reconnected by Charlotte Water.
Water Treatment & Wastewater Treatment Chemicals-CANCELLED
Charlotte Water, a department of the City of Charlotte, utilizes chemicals in its Water Treatment and Waste Water treatment process at all of its plants. These plants estimated utilizations are included in the total estimated annual utilization for the purpose of providing annual quantity. The Supplier provide a full-service, turnkey solution to provide the Products and Services .
Chemicals supplied shall not contain soluble minerals or organic substances in quantities capable of producing deleterious or injurious effect upon public health or water quality. Product shall not contain quantities or concentrations of any metals including but not limited to mercury, zinc, copper, arsenic, cyanide or any other impurity that prevents compliance with NPDES permits or 503 Biosolids regulations or other regulations in place. The National Sanitation Foundation Standard Number 60 and/or 61 will be used as the guideline for acceptability. Analysis as required must be submitted for evaluation of bids prior to award of contract.
Charlotte Water has determined that it will utilize a Reverse Auction for obtaining pricing for Water Treatment and Waste Water Treatment Chemicals
2/27 Cancelled
Locating Services – Cancelled
Locate Charlotte Water Facilities in the public street right of way and in the easements owned by the City of Charlotte.
Can Style Lift Stations Phase I – Cancelled
Removal and replacing existing control panels of each lift station, and other miscellaneous site work for installation of a new control cabinet and meter vault.
960 Zone North-South Transmission Main – Cancelled
30,500 LF of 30-inch between Idlewild discharge main and Hickory Grove EST
960 Zone West-East Transmission Main – Cancelled
16,000 linear feet (LF) of 30-inch between existing 30-inch on Albemarle Rd and the Wilgrove EST
978 Zone PCCP Replacement Main- Cancelled
Proposed 32,000 linear feet of 12-inch water main extending north from 978 zone resiliency booster pump station.
978 Zone Transfer Support Water Transmission – Cancelled
Approximately 35,000 feet of 48-inch transmission main extending north