CLTWater is seeking a consultant to provide design and testing of corrosion protection services for various water and sewer utility-related projects. These projects may include the construction of sewer mains, water mains, relocation of water and sewer utilities for roadway and light rail transit improvement projects, rehabilitation of existing structures and other projects as determined by CLTWater.
Elevated Storage Tank Engineering Services
The Project consists of designing multiple new elevated storage tanks ranging in size from approximately 1.5 MG to 3.0 MG. CLTWater intends for the selected Company to provide services for three elevated storage tanks. The selected firm would also be asked to evaluate the quality of additional existing storage tanks in the CLTWater system.
Brief Road Water Main Extension – CANCELLED
This project is located in Mint Hill. It includes extending the water main along Brief Road using approximately 8,700 feet of 12 inch water main.
Campus Ridge Road Gravity Sewer Project – CANCELLED
This project provides for the design and construction of approximately 3,000 feet of 12-inch gravity sewer to server Campus Ridge Road in South Charlotte.
Independence Blvd. Widening – Sewer -Cancelled
Project provides for the relocation and replacement of sewer infrastructure associated with the Independence Blvd widening project.
Independence Blvd. Widening – Water – Cancelled
Project provides for the relocation and/or replacement of water infrastructure associated with the Independence Blvd widening project.
Sugar & Irwin WAS Equalization Tanks at McAlpine – Cancelled
Proposed project is to fund a new 31,000 gallon above-equalization grade tank to receive the waste activated sludge (WAS) pumped from Sugar Creek Wastewater Treatment Plant, a new 25,000 gallon equalization tank to receive WAS from Irwin Creek Wastewater Treatment Plant and potentially a new additional 30,000 gallon equalization tank to receive WAS from Long Creek.
Site Improvements at Charlotte Water’s Field Operations, Zone 1 & 2
The Project consists of the repaving of two different Charlotte Water Facilities: Zone 1 which is located at 11609 Hord Drive Huntersville, NC 28078, and Zone 2 located at 5730 General Commerce Drive Charlotte, NC 28213. Zone 1 encompasses additional aspects besides the repaving, including a proposed storm drainage system, water and sanitary sewer extensions, and the enlargement of the existing detention pond. Zone 2 includes some storm drainage, curb and gutter, and concrete apart from the repaving.
Zone 4 Field Operations Facility Replacement – Cancelled
This project includes the replacement of the existing Zone 4 facility located at 4100 West Tyvola Road. The plan is to add additional office square footage for both field crews and admin staff at this location.