Charlotte Water will be seeking bids for the purchase two Gardner Denver centrifugal blowers for its McAlpine Creek Wastewater Treatment Plant. These blowers are to be utilized for backwashing effluent filters. Awarded bidder will be responsible for the shipment of the items to the facility. The equipment will be installed as part of a future construction contract. The needed control panels will be supplied by a third party.
Bid price will include a one-year warranty from the time of installation or 18 months from the time of delivery. Bid price will also include up to three one-day site visits to assist Charlotte Water’s third party contractor with installation and start-up as required.
This contract is for water and sanitary sewer service installations including connection to the existing public main, which extends a small diameter line to the property, and includes a water meter box or sanitary sewer cleanout. Customers pay connection fees for the installation service, which is based on costs incurred by Charlotte Water in these contracts. The work covered by this contract will provide approximately 800 total services.
This contract is for water and sanitary sewer service installations including connection to the existing public main, which extends a small diameter line to the property. Additionally, a water meter box or sanitary sewer cleanout is included. Customers pay connection fees for the installation service, which is based on costs incurred by Charlotte Water in these contracts. The work covered by this contract will provide approximately 800 total services.
Rehabilitation of wastewater pumping stations. Includes replacement of submersible pumps and pump controls. Makes improvements to flow metering and SCADA systems.
5/13 consolidated with Lift Station Improvements Phrase III.
This contract is for professional services in support of the Design and Construction Division. These contracts will allow Design and Construction to assist with LCR projects which typically require a longer and more complicated design process which in turn is more costly. Examples of reasons for increased cost in LCR projects versus typical street main extensions would be the need for geotechnical investigation or wetlands investigation and permitting.
This contract is for professional services in support of the Design and Construction Division. These contracts will allow Design and Construction to assist with LCR projects which typically require a longer and more complicated design process which in turn is more costly. Examples of reasons for increased cost in LCR projects versus typical street main extensions would be the need for geotechnical investigation or wetlands investigation and permitting.
This contract is for professional services in support of the Design and Construction Division. These contracts will allow Design and Construction to assist with LCR projects which typically require a longer and more complicated design process which in turn is more costly. Examples of reasons for increased cost in LCR projects versus typical street main extensions would be the need for geotechnical investigation or wetlands investigation and permitting.
Charlotte Water will be seeking contracts with companies for the as-needed purchase of fire hydrants and American Flow Control, Clow, Kennedy, and Mueller fire hydrant parts. One manufacturer will be selected (based on low bid) for the purchase of fire hydrants, and contracts for parts will be established for each manufacturer. Fire hydrants and parts shall be delivered to the Charlotte Water location specified at the time of purchase, with the most frequent delivery location being 5730 General Commerce Drive, Charlotte, North Carolina 28216.
this opportunity was archived earlier
Charlotte Water will be seeking contracts with companies for the as-needed purchase of fire hydrants and American Flow Control, Clow, Kennedy, Mueller and E J (East Jordan Iron Works) fire hydrant parts. One manufacturer will be selected (based on low bid) for the purchase of fire hydrants, and contracts for parts will be established for each manufacturer.