The project includes, but is not limited to, the renovation of the second floor of the McAlpine Creek WWMF Administration Building and the replacement of HVAC equipment on both floors and outside of the building. Work includes partial demolition of existing facilities to renovate two laboratories, upgrade restroom facilities, convert nonfunctioning lab space into office space, upgrade currently operating lab space, and replace non-functioning HVAC system and associated appurtenances.
Water and Sewer Service Dismantlements – cancelled
Charlotte Water will be advertising a construction Invitation to Bid for a new Water and Sewer Dismantlement Contract. This contract will provide dismantlement of existing water and sewer services as they are requested by customers.
this opportunity was archived earlier
Water and Sewer Service Dismantlements-CANCELLED
Charlotte Water will be advertising a construction Invitation to Bid for a new Water and Sewer Dismantlement Contract. This contract will provide dismantlement of existing water and sewer services as they are requested by customers.
Cancelled as of 10/22/2025
Blast Survey and Monitoring Services
This Request for Proposal will establish contracts for Charlotte Water’s as-needed blast survey and monitoring services. Blasting is performed to remove rocks during construction, which may affect the surrounding structures’ integrity. Thus, surveys and monitoring must be performed.
Coffee Service Solution
Charlotte Water will seek a multi-year turn-key coffee service solution for its breakrooms in each applicable facility. The selected company will provide rental equipment (bean-to-cup and pod coffee makers), maintenance and repairs of the equipment, their full product selection, and related services such as refilling the equipment.
Franklin Water Treatment Plant Building Renovation-CANCELLED
The proposed project will fund renovation of Franklin Water Treatment Plant Main Building. It provides 85% of the potable water produced and is need of major renovations such as HVAC, plumbing, process lab, building offices and parts storage for water treatment. Major architectural renovations such as curtainwall and windows are included. Rearrangement of space for laboratories, parts storage, office space, and records storage.
Cancelled as of 11/7/2024
Franklin Water Treatment Plant Building Renovation – cancelled
The proposed project will fund renovation of Franklin Water Treatment Plant Main Building. It provides 85% of the potable water produced and is need of major renovations such as HVAC, plumbing, process lab, building offices and parts storage for water treatment. Major architectural renovations such as curtainwall and windows are included. Rearrangement of space for laboratories, parts storage, office space, and records storage.
this opportunity was archived earlier
CENTRIFUGE PREVENTIVE MAINTENANCE AND REPAIR SERVICES-Mallard Creek WRF
Company to provide the city centrifuge preventive maintenance, predictive maintenance, and repair services for 2 (two) dewatering centrifuges and 2 (two) Thickening Centrifuges at the Mallard Creek WRF , Westfalia and Humboldt Dewatering Centirfuge and Humboldt Thickening Centrifuge. In addition to Preventive Maintenance, the selected Company will need to provide predictive maintenance service.
Franklin Water Treatment Plant Clearwell Improvements
Charlotte Water is requesting bids for construction of the Franklin Water Treatment Plant Clearwell project. This project includes installation of large diameter (72 to 120 inch) pipes, valves, and fittings. It also includes constructing a new chemical feed system, including a new building, pumps, storage silos, and chemical piping.