Coffey Creek Environmental Mitigation (Re-Solicit)

The purpose of the Coffey Creek Environmental Mitigation bid is to establish a lump sum contract with a qualified contractor to construct the features and components of the Corrective Action Plan that has been designed by WSP, (as Wood Environment & Infrastructure Solutions, Inc.) (the “CAP Design”) for the former U.S. Airways Maintenance Hangar site located at 5020 Hangar Road in Charlotte, Mecklenburg County, North Carolina on behalf of Charlotte Douglas International Airport (CLT). The CAP Design (dated October 20, 2022) was submitted to the North Carolina Department of Environmental Quality (NCDEQ) for review. NCDEQ issued a Notice of Regulatory Requirements (NORR) letter (dated November 30, 2022) indicating approval of the Corrective Action Plan (CAP).

Coffey Creek Environmental Mitigation (3rd Re-Solicitation)

The purpose of the Coffey Creek Environmental Mitigation bid is to establish a lump sum contract with a qualified contractor to construct the features and components of the Corrective Action Plan that has been designed by WSP, (as Wood Environment & Infrastructure Solutions, Inc.) (the “CAP Design”) for the former U.S. Airways Maintenance Hangar site located at 5020 Hangar Road in Charlotte, Mecklenburg County, North Carolina on behalf of Charlotte Douglas International Airport (CLT). The CAP Design (dated October 20, 2022) was submitted to the North Carolina Department of Environmental Quality (NCDEQ) for review. NCDEQ issued a Notice of Regulatory Requirements (NORR) letter (dated November 30, 2022) indicating approval of the Corrective Action Plan (CAP).

Coffey Creek Environmental Mitigation

Work performed under this contract will involve construction of a Hydraulic Cut-Off Barrier to limit migration of contaminants into Coffey Creek.  The barrier will be constructed below grade of Composite Bentonite Aggregate (CBA) and will be roughly 400 feet long, 12 feet tall, and 1 foot wide.  The project site is located within the secure area of Charlotte-Douglas International Airport and will require that all security measures be followed throughout the duration of the project.

CCTV Pipe Inspection

As part of the ongoing efforts to ascertain condition of underground utilities, an on call contract for pipe inspection services is needed inclusive of confined space entry, closed circuit television videography, inspection diagrams and condition reports.

On-Call Materials Testing CANCEL

As part of the airfield master plan efforts to repair runways, taxiways, shoulders, and apron materials testing is needed to meet inspection requirements for placement of concrete and asphalt. The project includes inspection sample cores and final data reports for all pavement materials placed on the airfield. All work shall conform to FAA circular requirements.

Asphalt Shoulder Rehabilitation-Phase II

Taxiway Shoulder Pavement Repair Phase II includes the pavement repair of identified taxiway shoulders, runway shoulders, and a blast pad. The Project does not include providing or installing pavement markings, either new or the restoration of damaged existing markings.  The bidder will be expected to reasonably avoid damaging existing pavement markings when possible.  The Charlotte Douglas Airport (CLT) Airfield Maintenance (AFM) staff will install all necessary pavement markings as well as perform any electrical operations.

Cell Phone Lot Auxiliary Lane

The Cell Phone Lot Auxiliary Lane project will provide a full auxiliary lane along Josh Birmingham Highway that spans from the Cell Phone Lot and Long Term 1 Bus Exit to the entrance of the Cell Phone Lot. This project includes construction of a modular precast block wall, traffic control, erosion and sedimentation control, grading, drainage, construction of curb and gutter, landscaping, relocation of light and banner poles, asphalt paving, fencing, and signage.

Josh Birmingham Parkway Cell Lot and Bypass

The Josh Birmingham Parkway Cell Lot and Bypass project includes the addition of a commercial vehicle road bypass near Gate 80 that connects the existing Airport Beacon Ln and the lower commercial vehicle entrance at the Charlotte Douglas International Airport (CLT) terminal.  This project will also include a full auxiliary lane along Josh Birmingham Parkway that spans from the Cell Phone Lot and Long Term 1 Bus Exit to the entrance of the Cell Phone Lot.  This project includes erosion and sedimentation control, grading, drainage, construction of curb and gutter, landscaping, asphalt paving, utilities, construction of a modular precast block wall, traffic control, relocation of light and banner poles, fencing, and signage.

HVAC Air Filters

The scope of this contract shall be to provide air filtration products as described and to perform quarterly changes of these air filtration products for the air handling units which condition the air for the main terminal building, five concourses and the CLT Center. This contract is not federally funded. The potential to add and/or remove units due to construction or other purposes will be requested as needed.