Repositioning the major passenger circulation route of the D/E connector between the Atrium to the end of the moving walkways at the approach of Concourse D. Relocating the airline lounge space from the departure level to an upper-level location while expanding it to 40,000 square feet. Providing a new passenger destination and experience at the departures level that will provide increased financial returns to the airport. Providing a service area at the apron level to help with operations within the DECO area.
Concourse E Gate E5/E5-A Modifications
Modifications-renovations minor changes to existing hold room and the exterior of building. A new door to the exterior of the building, steel walkway ramp from the building down to the ramp, new electrical and data and security work associated with the new door.
On-Call Civil Engineering Consultant
Charlotte Douglas International Airport (CLT) is seeking statements of qualifications from professional engineering firms to provide task order engineering services. Services are expected to cover a range of smaller studies, conceptual designs, investigations, coordination processes and technical support of a limited nature. This Engineering and Construction Task Order contract is focused largely but not exclusively on support to “horizontal/flat-work” design engineering and construction support services for engineering.
Janitorial Services
Scope of services include but are not limited to labor, supervision, materials, equipment, chemicals, supplies, and incidentals for complete janitorial services at the following locations on airport property: CLT Airport Main Terminal, the Old Terminal, CLT Center, Business Valet, Taxi Hold Building, various other buildings, and various parking-related facilities, such as Toll Booths and elevators. The Company may also be requested to perform additional/incidental tasks, including, but not limited to, table set-up and break-down for special events at CLT in a manner acceptable to the City. The contract term will be for three years with the option to renew for two additional one-year terms.
West Boulevard Relocation (Design)
This project is associated with the Airport’s 4th Parallel Runway Project. West Boulevard will need to be relocated to Piney Top Drive and Byrum Drive in order to create space for the 4th Parallel Runway and South End-Around Taxiway. Intersection improvements and roadway widening will occur at various locations along the corridor.
The final Engineer of Record will start their services at 30%, by utilizing preliminary plans from the Master Civil Engineer
4th Parallel Runway (Design)
This program includes the planning, design, and construction of a 10,000-foot parallel runway and associated taxiway system to include the North End Around Taxiway Phase II and South End Around Taxiway. The 2016 Airport Capacity Enhancement Plan and 2018 FAA-approved forecast show the need for an additional runway at CLT. This runway will replace the existing crosswind runway and enhance capacity as the parallel configuration will provide greater operational benefit for more efficient air traffic flow in and out of CLT.
The Final Engineer of Record will start their services at 30%, by utilizing preliminary plans from the Master Civil Engineer. CLT may select multiple engineering firms to work on the various aforementioned project elements.
Commercial Moving Services Terminal Lobby Expansion
Provide commercial moving services of tenants, miscellaneous equipment, and furniture affected by the Terminal Lobby Expansion project.
Fuel Line Replacement (Canceled Re-Advertise Later Date)
Replace the fuel lines serving the Bank of America and Wilson Air fuel dispending cabinets from the fuel farm. The work includes a combination of fuel line removal/replacement and piping/dispenser cabinet modifications. The associated civil site work includes demolition, minor fencing, asphalt pavement milling, pavement removal, asphalt paving, and landscaping.
Project will Re-Advertise at a later date.
Land Development Consultant Services
The Charlotte Douglas International Airport (CLT), a City of Charlotte department, is diversifying its revenue through the development of Airport-controlled property not required for aeronautical purposes. To that end, CLT seeks a land development consultant to advise its commercial development strategy for multiple landside parcels in its landholdings. CLT will seek land leases for commercial development to be awarded via a public process with advisement from the land development consultant.