The scope of this contract shall be to provide demolition and abatement services for removing various commercial and residential structures around the airport.
The term of the Contract shall be for three (3) years with two (2) optional one (1) year renewals.
The scope of this contract shall be to provide asbestos and lead based paint reports on structures the Airport intends to demolish.
The term of the Contract shall be for three (3) years with two optional one-year renewals.
Provide technical consultant services to analyze, prepare and present data to the ACR that supports noise abatement initiative.
The term of the Contract shall be for three (3) years with two optional one-year renewals.
The Express Deck signage demolition will be a turnkey project for the removal and disposal of the sign assembly with the demolition of the supporting concrete columns, per construction drawings. The contract term of the shall be for a one-time purchase in which the project is estimated to be completed within 60 days.
Charlotte Douglas International Airport is seeking to purchase four (4) natural tree trunk/multi stem petrified Ficus trees for the interior main terminal lobby.
Perform a masterplan analysis of the baggage handling system at Charlotte Douglas International Airport. This includes review of the existing baggage handling system, establishment of a forecast analysis and growth requirements, development of a masterplan with implementation strategies, and preparation of budget estimates.
CLT is looking for a Company to perform preventative maintenance, troubleshoot, test, and repair a variety of switchgear and breakers. CLT installations range from the small facility with residential-type single-phase power to the very large facility with incoming service voltages to 25 KV (kilovolts).
Three (3) year term with two (2) additional one (1) year renewals.
The Facilities Department of Charlotte Douglas International Airport maintains a portfolio of various buildings, including the airport terminal, offices, fire stations, and tenant buildings, among others. The intent of this solicitation is to have a Company provide HVAC services for various Airport properties. The scope of services is required to assist the Airport with renovations, remodels, and maintenance of existing facilities. It will also include, but not limited to the following: service work, refrigerant, and hydronic piping, installation of equipment, duct work, insulation, and low voltage wiring.
Three (3) year term with two (2) additional one (1) year renewals.
Provide air filtration products and perform quarterly changes of these air filtration products for the air handling units which condition the air for the main terminal building, five concourses, and the CLT Center. Provide the labor to install the new air filters and to dispose of the old air filters from each of the air handling units in the service areas.
Three (3) year term with two (2) additional one (1) year renewals.