Irwin Rehabilitation Improvements charlotte-water

Charlotte Water / Construction

Irwin Rehabilitation Improvements

The Project consists of work in multiple process areas as follows: Replacement of the roof and HVAC equipment at the Administration building. Modifications to the existing grit removal chamber at the flow equalization facilities to include a 7-foot Parshall flume. Spot concrete, sealant, and pavement repairs at the flow equalization facilities. Installation of a third …

Pest Control Services aviation

Aviation / General Services

Pest Control Services

The scope of this contract shall be to furnish all supervision, labor, materials, tools, supplies, equipment, transportation, and applicable licenses and permits necessary to perform the services at CLT Airport and CATS. The Company shall be responsible for the removal and disposal of all dead pests on the job site of the type that are …

Airport Main Terminal Bagroom Conveyor Upgrades aviation

Aviation / Commodities & Goods

Airport Main Terminal Bagroom Conveyor Upgrades

This contract will be to provide the design, engineering, fabrication, transportation to/from the site, installation, removal, replacement, demolition, modifications, testing, and turning over in working order the Baggage Handling System conveyor equipment upgrades in compliance with specifications and drawings. Project estimated to be completed within a 6 months.  

AUTOMATED VERTICAL SHUTTLE STORAGE UNIT charlotte-area-transit-system

Charlotte Area Transit System / Commodities & Goods

AUTOMATED VERTICAL SHUTTLE STORAGE UNIT

Charlotte Area Transit System’s Rail Division is requesting bids for a new automated vertical storage unit for the South Blvd Light Rail Facility. This will include the replacement and removal the existing unit, which is approximately 25 years old. This bid submission shall include design, delivery and installation. The scope of this Invitation to Bid …

Replacement of the North Davidson Bus Wash charlotte-area-transit-system

Charlotte Area Transit System / Construction

Replacement of the North Davidson Bus Wash

CATS is requesting to replace one drive through vehicle wash (bus wash) unit with a new more efficient drive through vehicle wash (bus wash) to be placed inside the existing wash building. The unit will be replacing a single drive through wash bay in a two drive through wash bay system located at 929 North …

CATS Rail Glass Services charlotte-area-transit-system

Charlotte Area Transit System / General Services

CATS Rail Glass Services

This Request for Quote will be for our CATS Rail Operations. The need is for glass installs for shelters and transit amenities. Some of the glass installs will be for shelters to install specialized art glass. This service consists of standard glass repairs, removal, install and replacement of glass for shelters and transit amenities.   …

Water Transmission Line Easement Clearing Services charlotte-water

Charlotte Water / General Services

Water Transmission Line Easement Clearing Services

Charlotte Water will be seeking proposals for Water Transmission Line Easement Clearing Services. These services would potentially require heavy clearing of brush, including possible tree and stump removal, for properties in which access to water transmission line easements must be maintained by Charlotte Water.   Service areas and boundaries will be identified by Charlotte Water.   The …

Irwin Creek Wastewater Treatment Plant Cleaning of Process Tanks charlotte-water

Charlotte Water / General Services

Irwin Creek Wastewater Treatment Plant Cleaning of Process Tanks

Charlotte Water is seeking a company to perform all labor, materials, chemicals, supplies, equipment, transportation, and other incidentals required for the removal, mechanical dewatering, filtrate management, transportation, and disposal of all materials from the Irwin Creek wastewater treatment plant (WWTP) process tanks including six digester tanks and the digested sludge storage tank. Approximately 1,600,000 gallons …

Can Style Lift Stations Phase I – Cancelled charlotte-water

Charlotte Water / Construction

Can Style Lift Stations Phase I – Cancelled

Removal and replacing existing control panels of each lift station, and other miscellaneous site work for installation of a new control cabinet and meter vault.