Earlybird, Business Opportunity Pipeline, City of Charlotte

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Department

Solicitation Category

Utilization

Expected Release Date

Estimated Total Value

Clear

In Development Charlotte Water

Charlotte Water / Construction

Ashe Plantation Lift Station 

  • Posting Number: 2027-Q3(Jul-Sep)-CW-18598
  • Anticipated Posting Date: 2027-07-15
  • Last Updated: 10/22/25
Add to Calendar 2027-07-15 2027-07-15 Ashe Plantation Lift Station 

The Ashe Plantation Lift Station project involves the design, bidding, and construction of a new lift station utilizing the existing wet well built during Phase I of the Ashe Plantation Wastewater Treatment Plant. The proposed system is a duplex lift station with a capacity of 320 gallons per minute, which will connect to an 8-inch forcemain. This new infrastructure will convey wastewater to the Goose Creek basin. As part of the project, the existing package treatment plant will be decommissioned.

 

 

 

 

 

In Development Charlotte Water

Charlotte Water / Construction

Reclaimed Water Pumping Capacity Improvements at Mallard

  • Posting Number: 2026-Q1(Jan-Mar)-CW-17938
  • Anticipated Posting Date: 2026-01-31
  • Last Updated: 10/22/25
Add to Calendar 2026-01-31 2026-01-31 Reclaimed Water Pumping Capacity Improvements at Mallard

This contract will provide services to improve reclaimed water pumping capacity at the Mallard facility. The improvements will enhance system efficiency and support increased demand for reclaimed water usage. Upgrades will include pump replacements and infrastructure modifications.

In Development Charlotte Water

Charlotte Water / Construction

Sugar Creek Gasoline and Diesel Fuel Tank Installation

  • Posting Number: 2026-Q1(Jan-Mar)-CW-17944
  • Anticipated Posting Date: 2026-01-31
  • Last Updated: 10/22/25
Add to Calendar 2026-01-31 2026-01-31 Sugar Creek Gasoline and Diesel Fuel Tank Installation

This contract covers the installation of a new gas and diesel fuel tank at the Sugar Creek facility. The project will support fleet fueling operations and ensure compliance with environmental regulations. Proper installation and containment measures will be included.

In Development Charlotte Water

Charlotte Water / Construction

Fiscal Year 2026 Street Main Extensions Contract 2

  • Posting Number: 2026-Q1(Jan-Mar)-CW-17887
  • Anticipated Posting Date: 2026-01-15
  • Last Updated: 10/06/25
Add to Calendar 2026-01-15 2026-01-15 Fiscal Year 2026 Street Main Extensions Contract 2

This contract will include the construction of street main extensions and various infrastructure projects. The contract will provide construction assistance for other capital projects as needed. It covers the entire Charlotte Water service area, ensuring water distribution system improvements.

In Development Charlotte Area Transit System

Charlotte Area Transit System / General Services

CATS Facilities – Plumbing Maintenance and Repair Services

  • Posting Number: 2025-Q4(Oct-Dec)-CATS-18831
  • Anticipated Posting Date: 2025-11-08
  • Last Updated: 10/03/25
Add to Calendar 2025-11-08 2025-11-08 CATS Facilities – Plumbing Maintenance and Repair Services

The Charlotte Area Transit System (CATS) Facilities division is responsible for maintaining a portfolio of approximately 25 buildings, including offices, Park & Rides, Maintenance Facilties, equipment shops, that house various CATS activities.  CATS anticipates contracting for commercial plumbing services on an on-call at various locations as directed by the CATS Facilities Manager. The Company shall respond to emergency calls for service within 24 hours. Services include all labor, materials, equipment, and supervision for the plumbing projects.  This would be a three year contract with two one-year renewals.

PSR # 1938

In Development Charlotte Water

Charlotte Water / Technology Goods & Services

Automatic Meter Reading (AMR) Replacement Phase 3

  • Posting Number: 2025-Q4(Oct-Dec)-CW-17257
  • Anticipated Posting Date: 2025-12-12
  • Last Updated: 10/02/25
Add to Calendar 2025-12-12 2025-12-12 Automatic Meter Reading (AMR) Replacement Phase 3

This project will upgrade the existing meter reading system to a self-reporting network and replace end of life residential meters. Existing communication endpoints not compatible with the network selected will be replaced. Most residential meters will be replaced; those meters not replaced will require a replacement register compatible with the new endpoints. Commercial meters will receive replacement registers or be replace, depending on compatibility with the selected network solution. The communication network, hourly interval data and customer access portal will improve customer experience, increase billing efficiency and accuracy, reduce system losses and operational expenses, and improve system monitoring and planning.

In Development Charlotte Storm Water Services

Charlotte Storm Water Services / Construction

1206 Georgetown

  • Posting Number: 2026-Q2(Apr-Jun)-CSWS-19051
  • Anticipated Posting Date: 2026-04-01
  • Last Updated: 10/02/25
Add to Calendar 2026-04-01 2026-04-01 1206 Georgetown

The project is bounded by Pondella Drive to the West and North, Georgetown Drive to the South and Rosada Ave to the East.  The project involves storm drainage improvements along Georgetown Rd primarily with some improvements in intersections with Rosada Avenue and Pondella Drive.

In Development Charlotte Storm Water Services

Charlotte Storm Water Services / Construction

Reece Rd

  • Posting Number: 2026-Q3(Jul-Sep)-CSWS-19049
  • Anticipated Posting Date: 2026-09-01
  • Last Updated: 10/02/25
Add to Calendar 2026-09-01 2026-09-01 Reece Rd

The project is bounded by the Park Rd Shopping Center to the South, Park Rd to the West, Arbor Lane to the North and Little Sugar Creek to the East.  The project involves storm drainage improvements along Reece Rd primarily with some improvements in intersections with Park Rd and Arbor Lane.

In Development Charlotte Water

Charlotte Water / Construction

Fiscal Year 2026 Street Main Extensions Contract 1

  • Posting Number: 2026-Q1(Jan-Mar)-CW-17885
  • Anticipated Posting Date: 2026-01-15
  • Last Updated: 10/02/25
Add to Calendar 2026-01-15 2026-01-15 Fiscal Year 2026 Street Main Extensions Contract 1

This contract includes the construction of multiple street main extensions and other miscellaneous infrastructure projects. It will provide construction assistance on an as-needed basis for other capital projects. The scope covers the entire Charlotte Water service area, ensuring water distribution system improvements where necessary.

In Development Charlotte Storm Water Services

Charlotte Storm Water Services / Construction

2500 Briargrove Dr.

  • Posting Number: 2026-Q2(Apr-Jun)-CSWS-19039
  • Anticipated Posting Date: 2026-04-01
  • Last Updated: 10/02/25
Add to Calendar 2026-04-01 2026-04-01 2500 Briargrove Dr.

This project involves installing a closed drainage system down both Briargrove Dr. and Milton Rd. to reroute runoff from an existing stream. The proposed closed drainage system ties back into the existing culvert under Colby Pl.

In Development Charlotte Water

Charlotte Water / General Services

Standby Power and Instrumentation at Tank Sites

  • Posting Number: 2026-Q2(Apr-Jun)-CW-18593
  • Anticipated Posting Date: 2026-05-01
  • Last Updated: 10/02/25
Add to Calendar 2026-05-01 2026-05-01 Standby Power and Instrumentation at Tank Sites

This construction contract includes the installation of new natural gas or propane-powered generators at multiple water storage tank sites. The work also involves associated miscellaneous electrical improvements necessary to support standby power functionality. These upgrades are intended to enhance system reliability and ensure continuous operation during power outages.

In Development Charlotte Water

Charlotte Water / General Services

Wastewater Treatment Site Landscape Management

  • Posting Number: 2026-Q1(Jan-Mar)-CW-18186
  • Anticipated Posting Date: 2026-01-31
  • Last Updated: 10/02/25
Add to Calendar 2026-01-31 2026-01-31 Wastewater Treatment Site Landscape Management

This contract will provide landscaping services at various Charlotte Water wastewater treatment locations. Work may include mowing, tree trimming, and general upkeep of facility grounds. The task is to maintain these areas, improving site aesthetics and safety.