Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.
147 results found

Charlotte Storm Water Services / Construction

Charlotte Storm Water Services / Construction
Old Plank portion of project: Project initiated due to failure of 84” CMP system on Old Plank Rd. City plans to remove and replace 86” CMP with 56LF 8’x7’ RCBC; Add (2) concrete wingwalls;
Caldwell Williams portion of project: Project initiated due to road flooding. City plans to replace (2) 60” CMP pipes with 39 LF of 13×5 Box culvert. City also intends to add 40LF of 18” RCP; (2) Double catch basins and (2) concrete wingwalls; Pavement and curb replacement.

Charlotte Storm Water Services / Construction
Project initiated to permanently fix what was an old AFT project. City intends to replace the existing 12’x8’ CMP and replace with approx. 50 LF of 10×8 RCBC; Add (2) concrete wingwalls; (4) CBs; (1) JB; Asphalt and curb replacement; Tie existing sewer crossing into a separate system (2) SSMH’s and approx 30 LF of 8” DIP; 15 LF 15” PVC

Charlotte Area Transit System / Construction
The Charlotte Area Transit System (CATS) anticipates soliciting for the repair of a damaged storm drain pipe along 4th Street in order to improve drainage at the Charlotte Transportation Center.
PSR # 1955

Charlotte Area Transit System / Construction
The Charlotte Area Transit System (CATS) development division anticipates contracting out the repair at six (6) parking decks:
The scope of work includes, but is not limited to, the following:
PSR # 1969

Charlotte Water / Construction
The project consists of providing equipment, vehicles, machinery, implements, tools, supplies, incidentals, and skilled personnel to complete unspecified extensions, modifications, maintenance, and repairs to the existing water and
sewer system in the Charlotte Water service area.

Charlotte Water / Construction
The Ashe Plantation Lift Station project involves the design, bidding, and construction of a new lift station utilizing the existing wet well built during Phase I of the Ashe Plantation Wastewater Treatment Plant. The proposed system is a duplex lift station with a capacity of 320 gallons per minute, which will connect to an 8-inch forcemain. This new infrastructure will convey wastewater to the Goose Creek basin. As part of the project, the existing package treatment plant will be decommissioned.

Charlotte Water / Construction
This contract will provide services to improve reclaimed water pumping capacity at the Mallard facility. The improvements will enhance system efficiency and support increased demand for reclaimed water usage. Upgrades will include pump replacements and infrastructure modifications.

Charlotte Water / Construction
This contract covers the installation of a new gas and diesel fuel tank at the Sugar Creek facility. The project will support fleet fueling operations and ensure compliance with environmental regulations. Proper installation and containment measures will be included.

Charlotte Water / Construction
This contract will include the construction of street main extensions and various infrastructure projects. The contract will provide construction assistance for other capital projects as needed. It covers the entire Charlotte Water service area, ensuring water distribution system improvements.

Charlotte Storm Water Services / Construction
The project is bounded by Pondella Drive to the West and North, Georgetown Drive to the South and Rosada Ave to the East. The project involves storm drainage improvements along Georgetown Rd primarily with some improvements in intersections with Rosada Avenue and Pondella Drive.

Charlotte Storm Water Services / Construction
The project is bounded by the Park Rd Shopping Center to the South, Park Rd to the West, Arbor Lane to the North and Little Sugar Creek to the East. The project involves storm drainage improvements along Reece Rd primarily with some improvements in intersections with Park Rd and Arbor Lane.
The Hastings/Princeton Storm Drainage Improvement Project will reduce street and structure flooding throughout the neighborhood. Located within a drainage area of approximately 80 acres, the project will replace aging infrastructure and provide adequate system capacity. The project area is bordered by Wellesley Avenue to the north, Hastings Drive to the south, Selwyn Avenue to the east and Jamestown Drive to the west.