Opportunities per Page
Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.
From Date
To Date
Opportunities per Page

Charlotte Fire Department, Department of General Services / Construction
CFD – Fire House 22 – Equity Improvements – Addition ... CFD – Fire House 22 – Equity Improvements – Addition and Renovations

Aviation / Construction
Concourse A Modifications
This Project aims to modify and relocate existing equipment, replace tables, add an experiential element, and extend tenant services at the Charlotte Douglas International Airport. The modifications of the existing equipment will accommodate a dual-use system at each Gate Counter including the electrical and data infrastructure leading up to the network. There will be a Flight Information Display System” that will need to be relocated in the connecting corridor which includes structural attachments to the building and repairs to the existing Terrazzo. Work hours between 2300 – 0500 EST to prevent disruption to Airport Operations. This project will require 100% badging for all workers.

Department of General Services / Construction
North Tryon St Left Turn Lane at University City Blvd
The purpose of this project is to improve traffic flow on North Tryon Street by extending the left turn lane. This project will include lane widening, drainage and pavement markings.

Charlotte Storm Water Services / Construction
Louise Ave Storm Drainage Improvement Project
This construction project is located just east of downtown along an unnamed tributary to Little Sugar Creek on Louise Ave. The purpose and need for the project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.

Charlotte Storm Water Services / Construction
Craighead/Tryon Storm Drainage Improvement Project
The Craighead/Tryon Storm Drainage Improvement Project is bordered by Glory Street to the north, Little Sugar Creek to the south, Sugar Creek Road to the east and Craighead Road to the west. The existing drainage system consists of pipe system under city-maintained road, state-maintained road, and private property. The improvements include pipe system upgrades.

Charlotte Storm Water Services / Construction
Collective AE Storm Drainage Improvement Project
Collective Storm Drainage Improvement Projects Series AE will involve 3 projects throughout the City of Charlotte, 3880 Jeff Adams Dr, 4440 Holbrook Dr, 4611 Denver Av Phase 2. 3880 Jeff Adams Drive will consist of lining approx. 562 LF 54″ CMP with CIPP. Also to include lining 12″ and 15″ systems that tie into main 54” system. We will also be doing invert repair in 54″ pipe where it has eroded. This project will need traffic control along Jeff Adams during construction and foundation protection on the permanent structure located on site. MH and DI adjustments are included in this scope along with asphalt resurfacing around them. 4440 Holbrook Drive scope will include installation of approx. 165LF 30″ RCP; 65LF 36″ RCP; 110LF 29×45 Elliptical pipe; 11LF 24″ RCP; 12LF 18″ RCP; 28LF 15″ RCP. Approx 200 LF of 30” RCP and 15” RCP will be removed and another approx. 200LF of RCP is to be plugged and abandoned. Scope also intends to replace approx. 105LF of sewer with 8” DIP and replace (2) sewer manholes. Storm drainage structure replacement, foundation protection, asphalt resurfacing and curb and gutter replacement to also be included. 4611 Denver Av Phase 2 scope will include removal of approx. 75 LF of duel 60” CMP and installation of 65LF of a 10×5 RCBC. Project to include approx. 314 LF of sewer replacement and (6) MHs. Scope also to include concrete headwalls and full-depth pavement resurfacing.

Charlotte Storm Water Services / Construction
Shamrock Gardens Storm Drainage Improvement Project
This construction project is located near Eastway Drive and Shamrock Drive and involves addressing a deteriorated corrugated metal pipe system located within the Shamrock Gardens Apartment complex as well as flooding of multiple roadway crossings. An analysis of existing conditions will be performed to determine portions of the storm drainage system needing improvement, planning analysis of improvement alternatives, design and construction of needed improvements. The Shamrock Gardens Storm Drainage Improvement Project is bordered by Purser Drive to the north, Shamrock Drive to the south, Briar Creek to the east and Eastway Drive to the west.

Aviation / Construction
CLT Center Storm Drainage Project
This project is located in a parking lot behind the CLT Center located at 5601 Wilkinson Boulevard in Charlotte, NC. The purpose of the project is to install new pipe to contain and drain runoff from the building to an existing storm drainage system at the rear of the parking lot. The work involves installation of reinforced concrete pipe, storm drainage structures, asphalt surface, and re-striping the parking lot within the construction corridor.

Department of General Services / Construction
Monroe Road Streetscape
Improvements on Monroe Road between North Wendover Road and Eaton Road to create a more pedestrian-oriented corridor and install a pedestrian hybrid beacon in front of Time Out Youth Center. Improvements will primarily include shared-use paths, drainage, and midblock pedestrian crossings.

Department of General Services / Construction
Cross Charlotte Trail (XCLT)− Matheson to Craighead (REVISED 7/2025) ... Cross Charlotte Trail (XCLT)− Matheson to Craighead (REVISED 7/2025)
The Matheson to Craighead segment of the Cross Charlotte Trail will implement a 14-foot shared use path beginning at E 36th Street. The path will continue down Cullman Ave and board walk up into a pedestrian bridge spanning the Norfolk Southern Railroad tracks utilizing a prefabricated structure within railroad right of way. The structure will then connect to the existing trail built by Brand Properties within the Kaleido Noda apartment complex.
July 2025 Update: This project will not go out for public bid; it is now being designed and constructed through a reimbursement agreement with a private developer.

Department of General Services / Construction
Firehouse 44
Firehouse 44 will be an integral asset to support Charlotte Fire Department’s efficient response to emergencies in the community; providing a location within the newly developed River District community and expanding their response area in this newly incorporated region of Charlotte. This 14,600 SF, two-story, 3-bay facility will be the first mass timber firehouse in the Southeast US and will meet Living Future’s (LF) Zero Carbon certification for total project embodied carbon. The project will comply with Charlotte’s Sustainable Facilities Policy and fully support the sophisticated and time-sensitive operations of the Fire Department.

Charlotte Area Transit System / Construction
CTC Fare Zone Striping
The Charlotte Area Transit System (CATS) anticipates contracting out the following work:
The CTC Fare Zone Striping project is a part off safety and security improvements at the Charlotte Transportation Center that will include the installation of the following approximate quantities of heated-in-place thermoplastic markings:
-950 linear feet of customized 2′-wide blue striping labeled with “FARE ZONE”;
-470 linear feet of pedestrian crosswalk (8 separate crosswalks); and
-920 linear feet of safety yellow striping for 23 bus bays.
Other additional work includes the installation of 31 yellow truncated domes, removal of existing crosswalk striping, and providing 121 linear feet of additional blue “FARE ZONE” striping to be turned over to CATS.
Heat-in-place thermoplastic will be installed per NCDOT specifications. The crosswalk and truncated dome will match the City of Charlotte Land Development Standards.
PSR # 1917
An addition and equity renovation to existing fire station 22. The addition includes an expanded kitchen, fitness room, restroom, and other ancillary spaces. Renovated areas include the dormitory, the apparatus bay along with ADA improvements throughout the building and site.