Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Department

  • Aviation
  • Charlotte Area Transit System
  • Charlotte Communications & Marketing
  • Charlotte Department of Transportation
  • Charlotte Fire Department
  • Charlotte Mecklenburg Police Department
  • Charlotte Planning, Design & Development
  • Charlotte Storm Water Services
  • Charlotte Water
  • City Attorney’s Office
  • City Clerk
  • City Manager's Office
  • City Wide
  • Community Relations
  • Department of General Services
  • Economic Development
  • Finance
  • Housing & Neighborhood Services
  • Human Resources
  • Innovation & Technology
  • Internal Audit
  • Solid Waste Services
  • Strategy & Budget

Solicitation Category

  • Architectural / Engineering Services
  • Commodities & Goods
  • Construction
  • Construction Cost Estimating
  • General Services
  • Technology Goods & Services

Utilization

  • SBE-Small Business Enterprise
  • DBE-Disadvantaged Business Enterprise
  • MBE-Minority Business Enterprise
  • WBE-Women Owned Business Enterprise

Expected Release Date

From Date

To Date

Estimated Total Value

  • $10,000 - 49,999
  • $50,000 - 99,999
  • $100,000 - 249,999
  • $250,000 - 499,999
  • $500,000 - 999,999
  • $1,000,000 -4,999,999
  • $5,000,000 - 9,999,999
  • $10,000,000+
Clear

Opportunities per Page

In Development charlotte water

Charlotte Area Transit System / Construction

North Yard Storage Site Construction

  • Posting Number: 2025-Q2(Apr-Jun)-CATS-17426
  • Anticipated Posting Date: 2025-05-18
  • Last Updated: 03/16/25
Add to Calendar 2025-05-18 2025-05-18 North Yard Storage Site Construction

The project will include construction up-fits at the North Yard Facility with intentions of utilizing the area as storage for CATS. The storage yard, also known as the North Yard Annex, will be a secured and monitored area with access control, security lighting, CCTV cameras, fencing, and power supply capable of providing climate control measures to material as needed.

PSR # 1840

In Development charlotte water

Charlotte Area Transit System / Construction

JW Clay Ballast Wall Repair

  • Posting Number: 2025-Q2(Apr-Jun)-CATS-17205
  • Anticipated Posting Date: 2025-04-03
  • Last Updated: 03/16/25
Add to Calendar 2025-04-03 2025-04-03 JW Clay Ballast Wall Repair

Repair track 1 ballast wall just north of JW Clay Station.

PSR # 1835

In Development charlotte water

Aviation / Construction

CLT Center Storm Drainage Project

  • Posting Number: 2025-Q2(Apr-Jun)-AVI-10761
  • Anticipated Posting Date: 2025-06-30
  • Last Updated: 03/11/25
Add to Calendar 2025-06-30 2025-06-30 CLT Center Storm Drainage Project

This project is located in a parking lot behind the CLT Center located at 5601 Wilkinson Boulevard in Charlotte, NC.  The purpose of the project is to install new pipe to contain and drain runoff from the building to an existing storm drainage system at the rear of the parking lot.  The work involves installation of reinforced concrete pipe, storm drainage structures, asphalt surface, and re-striping the parking lot within the construction corridor.

In Development charlotte water

Aviation / Construction

Runway 18L/36R and Taxiway Delta Rehab Construction

  • Posting Number: 2026-Q4(Oct-Dec)-AVI-17499
  • Anticipated Posting Date: 2026-12-14
  • Last Updated: 03/06/25
Add to Calendar 2026-12-14 2026-12-14 Runway 18L/36R and Taxiway Delta Rehab Construction

Charlotte Douglas International Airport (“CLT”) intends to issue an Invitation to Bid (“ITB”) for the rehabilitation construction of Runway 18L/36R and Taxiway D.  The scope of this work will include but is not limited to asphalt milling, paving, airfield electrical work, and pavement makings.

In Development charlotte water

Department of General Services / Construction

Central Kilborne Norland Intersection & Street Upgrade

  • Posting Number: 2025-Q2(Apr-Jun)-DGS-8945
  • Anticipated Posting Date: 2025-06-27
  • Last Updated: 02/24/25
Add to Calendar 2025-06-27 2025-06-27 Central Kilborne Norland Intersection & Street Upgrade

Project limits are from just south of Evergreen Cemetery Dr to about 400’ south of Central Ave at Kilborne Dr on Norland Rd (0.43 miles). The project includes a shared-use path on one side of the street, storm drainage, water line work, and 2 Rectangular Rapid Flashing Beacons (RRFBs).

In Development charlotte water

Charlotte Storm Water Services / Construction

Village Lake Dr 2210

  • Posting Number: 2025-Q4(Oct-Dec)-CSWS-17370
  • Anticipated Posting Date: 2025-11-15
  • Last Updated: 02/11/25
Add to Calendar 2025-11-15 2025-11-15 Village Lake Dr 2210

Project started due to surface depressions along roadway. City plans to remove and replace corrugated metal pipe with 83 linear feet (LF) of 8’ x 4’ reinforced concrete box culvert; remove and replace two headwalls; remove and replace 311 LF of 15″ reinforced concrete pipe (RCP); remove and replace 42 LF 24″ RCP; remove and replace 27 LF 18″ RCP; bank grading; and remove and replace 85 LF 10” ductile iron pipe of sewer.

In Development charlotte water

Department of General Services / Construction

Mallard Creek Road Shared-Use Path (Governor Hunt to Driwood)

  • Posting Number: 2026-Q3(Jul-Sep)-DGS-17368
  • Anticipated Posting Date: 2026-07-01
  • Last Updated: 02/03/25
Add to Calendar 2026-07-01 2026-07-01 Mallard Creek Road Shared-Use Path (Governor Hunt to Driwood)

This project will construct a shared-use path along the east side of Mallard Creek Road from Governor Hunt Road to Driwood Court. Specific improvements will also include construction of a plant strip, curb and cutter, accessible ramps, driveways, and potential storm drainage improvements. The purpose of this project is to improve pedestrian safety, mobility, and connectivity along Mallard Creek Road. Project Length = 0.4 miles.

In Development charlotte water

Department of General Services / Construction

WT Harris SUP (JW Clay to N Tryon)

  • Posting Number: 2026-Q2(Apr-Jun)-DGS-17369
  • Anticipated Posting Date: 2026-04-01
  • Last Updated: 02/03/25
Add to Calendar 2026-04-01 2026-04-01 WT Harris SUP (JW Clay to N Tryon)

A 12’ wide shared-use path will be installed along WT Harris Blvd, from JW Clay Blvd to N Tryon St. This includes pedestrian ramps, storm drain services, and new pavement markings in addition to the shared-use path.  Project Length = 0.33 miles.

In Development charlotte water

Department of General Services / Construction

Old Concord Road Shared-Use Path (Meadow Vista to Arlyn Cir)

  • Posting Number: 2026-Q2(Apr-Jun)-DGS-17201
  • Anticipated Posting Date: 2026-04-01
  • Last Updated: 02/03/25
Add to Calendar 2026-04-01 2026-04-01 Old Concord Road Shared-Use Path (Meadow Vista to Arlyn Cir)

This project will construct a shared-use path along the west side of Old Concord Road from Meadow Vista Road to Arlyn Circle. Construction of driveway improvements and wheelchair ramps are included in this scope. The construction of the shared-use path will help to improve safety and walking conditions for citizens along this minor thoroughfare. This project will also connect several miles of pedestrian walkways within this area. Old Concord Road Shared-Use Path is considered a high priority project based on CDOT’s sidewalk Priority list and was requested by the residents and business owners in the area. Improvements for Charlotte Water are also included in the project scope. Project Length= .85 miles.

In Development charlotte water

Department of General Services / Construction

Kuykendall Road Improvements

  • Posting Number: 2026-Q4(Oct-Dec)-DGS-17367
  • Anticipated Posting Date: 2026-10-01
  • Last Updated: 02/03/25
Add to Calendar 2026-10-01 2026-10-01 Kuykendall Road Improvements

This project will connect sidewalk along Kuykendall Road from
Thorn Blade Drive to McKee Road, and add a right-turn lane from
Kuykendall Road on to McKee Road in order to to increase
pedestrian safety and help alleviate traffic congestion at the
intersection. Project will also fill in small sidewalk gap on the south
side of McKee Rd at Kuykendall Rd and add pedestrian signals with
crosswalk at this intersection. Project length = approximately 0.75
miles.

In Development charlotte water

Charlotte Department of Transportation / Construction

2025 Pavement Marking Maintenance

  • Posting Number: 2026-Q3(Jul-Sep)-CDT-16961
  • Anticipated Posting Date: 2026-07-01
  • Last Updated: 01/21/25
Add to Calendar 2026-07-01 2026-07-01 2025 Pavement Marking Maintenance

This is a contract to install pavement markings on a list of city streets. The work includes, Thermoplastic, Polyurea, and Cold Applied Plastic markings.

In Development charlotte water

Charlotte Storm Water Services / Construction

Freedom Dr 3144 Storm Drainage Improvement Project

  • Posting Number: 2025-Q2(Apr-Jun)-CSWS-16842
  • Anticipated Posting Date: 2025-04-15
  • Last Updated: 01/21/25
Add to Calendar 2025-04-15 2025-04-15 Freedom Dr 3144 Storm Drainage Improvement Project

This Storm Drainage Improvement Project will replace failing storm water infrastructure at 3144, 3200, and 3232 Freedom Drive.  Project will install over 1500 feet of new storm drainage pipe.

 

1 2 4 5 6 10 11