logo

/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Department

  • Aviation
  • Charlotte Area Transit System
  • Charlotte Communications & Marketing
  • Charlotte Department of Transportation
  • Charlotte Fire Department
  • Charlotte Mecklenburg Police Department
  • Charlotte Planning, Design & Development
  • Charlotte Storm Water Services
  • Charlotte Water
  • City Attorney’s Office
  • City Clerk
  • City Manager's Office
  • City Wide
  • Community Relations
  • Department of General Services
  • Economic Development
  • Finance
  • Housing & Neighborhood Services
  • Human Resources
  • Innovation & Technology
  • Internal Audit
  • Solid Waste Services
  • Strategy & Budget

Solicitation Category

  • Architectural / Engineering Services
  • Commodities & Goods
  • Construction
  • Construction Cost Estimating
  • General Services
  • Technology Goods & Services

Utilization

  • SBE-Small Business Enterprise
  • DBE-Disadvantaged Business Enterprise
  • MBE-Minority Business Enterprise
  • WBE-Women Owned Business Enterprise

Expected Release Date

From Date

To Date

Estimated Total Value

  • $10,000 - 49,999
  • $50,000 - 99,999
  • $100,000 - 249,999
  • $250,000 - 499,999
  • $500,000 - 999,999
  • $1,000,000 -4,999,999
  • $5,000,000 - 9,999,999
  • $10,000,000+
Clear

Opportunities per Page

In Development charlotte water

Charlotte Storm Water Services / Construction

Barrington Drive 5919 Storm Drainage Improvement Project

  • Posting Number: 2024-Q3(Jul-Sep)-CSWS-7056
  • Anticipated Posting Date: 2024-09-17
  • Last Updated: 09/18/23
Add to Calendar 2024-09-17 2024-09-17 Barrington Drive 5919 Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

In Development charlotte water

Charlotte Storm Water Services / Construction

Gaynelle Storm Drainage Improvement Project

  • Posting Number: 2024-Q2(Apr-Jun)-CSWS-10937
  • Anticipated Posting Date: 2024-04-04
  • Last Updated: 09/18/23
Add to Calendar 2024-04-04 2024-04-04 Gaynelle Storm Drainage Improvement Project

This project is located on Gaynelle Drive between Langley Circle and Running Wood Lane. The existing drainage system consists of open channel and a culvert under a city-maintained road. The culvert system is experiencing blockages and is prone to flooding.

In Development charlotte water

Charlotte Storm Water Services / Construction

Collective AE Storm Drainage Improvement Project

  • Posting Number: 2024-Q3(Jul-Sep)-CSWS-12652
  • Anticipated Posting Date: 2024-09-04
  • Last Updated: 09/12/23
Add to Calendar 2024-09-04 2024-09-04 Collective AE Storm Drainage Improvement Project

Collective Storm Drainage Improvement Projects Series AE will involve 3 projects throughout the City of Charlotte, 3880 Jeff Adams Dr, 4440 Holbrook Dr, 4611 Denver Av Phase 2. 3880 Jeff Adams Dr will consist of lining approx. 562 LF 54″ CMP with CIPP. Also to include lining 12″ and 15″ systems that tie into main 54” system. We will also be doing invert repair in 54″ pipe where it has eroded. This project will need traffic control along Jeff Adams during construction and foundation protection on the permanent structure located on site. MH and DI adjustments are included in this scope along with asphalt resurfacing around them. 4440 Holbrook Dr scope will include installation of approx. 165LF 30″ RCP; 65LF 36″ RCP; 110LF 29×45 Elliptical pipe; 11LF 24″ RCP; 12LF 18″ RCP; 28LF 15″ RCP. Approx 200 LF of 30” RCP and 15” RCP will be removed and another approx. 200LF of RCP is to be plugged and abandoned. Scope also intends to replace approx. 105LF of sewer with 8” DIP and replace (2) sewer manholes. Storm drainage structure replacement, foundation protection, asphalt resurfacing and curb and gutter replacement to also be included. 4611 Denver Av Phase 2 scope will include removal of approx. 75 LF of duel 60” CMP and installation of 65LF of a 10×5 RCBC. Project to include approx. 314 LF of sewer replacement and (6) MHs. Scope also to include conc headwalls and full depth pavement resurfacing.

In Development charlotte water

Charlotte Storm Water Services / Construction

Collective AF Storm Drainage Improvement Project:

  • Posting Number: 2024-Q3(Jul-Sep)-CSWS-12654
  • Anticipated Posting Date: 2024-09-03
  • Last Updated: 09/05/23
Add to Calendar 2024-09-03 2024-09-03 Collective AF Storm Drainage Improvement Project:

Collective Storm Drainage Improvement Projects Series AF will involve 3 projects throughout the City of Charlotte 6112 Bridlewood Ln, 6108 Bridlewood Ln, 6032 Bridlewood Ln. 6112 Bridlewood Ln will consist of lining approx. 149 LF 15” RCP; 243 LF 30” RCP; 151 LF 36” RCP with CIPP. Scope also includes replacing rerouting the existing system into the r/w and adding approx. 177 42” RCP and 122 LF of 34×53 elliptical pipe and storm drainage structure replacement. There will also be approx. 418 LF of sewer replacement with 8” DIP. Pavement resurfacing and curb and gutter replacement are also to be included in this project. 6108 Bridlewood Ln will consist of removing an existing CMP pipe and replacing with approx. 31 LF of 9×7 RCBC. A temporary pedestrian bridge will be added to cross the creek during time of construction for the property owners. The scope is also to include approx. 31LF of 15” RCP replacement along with replacement of (1) CB, concrete driveway replacement, curb and gutter and pavement resurfacing. There will also be grading around the existing creek that will tie into (2) new HWs. 6032 Bridlewood Ln will consist of removing an existing CMP pipe and replacing with approx. 30 LF of 9×7 RCBC. A temporary pedestrian bridge will be added to cross the creek during time of construction for the property owners. The scope is also to include concrete driveway replacement, curb and gutter, and pavement resurfacing. There will also be grading around the existing creek that will tie into (2) new HWs.                

In Development charlotte water

Charlotte Water / Commodities & Goods

Fire Hydrants and Parts

  • Posting Number: 2024-Q4(Oct-Dec)-CW-7392
  • Anticipated Posting Date: 2024-10-01
  • Last Updated: 08/03/23
Add to Calendar 2024-10-01 2024-10-01 Fire Hydrants and Parts

Charlotte Water will be seeking contracts with companies for the as-needed purchase of fire hydrants and American Flow Control, Clow, Kennedy, and Mueller fire hydrant parts. One manufacturer will be selected (based on low bid) for the purchase of fire hydrants, and contracts for parts will be established for each manufacturer. Fire hydrants and parts shall be delivered to the Charlotte Water location specified at the time of purchase, with the most frequent delivery location being 5730 General Commerce Drive, Charlotte, North Carolina 28216.

In Development charlotte water

Charlotte Water / Commodities & Goods

Water and Sewer Materials

  • Posting Number: 2024-Q2(Apr-Jun)-CW-11990
  • Anticipated Posting Date: 2024-05-28
  • Last Updated: 08/03/23
Add to Calendar 2024-05-28 2024-05-28 Water and Sewer Materials

The scope of this Invitation to Bid (ITB) will be to establish a contract for the as needed purchase, delivery, and other inherently related activities to provide water and sewer materials in compliance with the ITBs specifications, terms, and conditions.  Materials include various size pipe fittings, clamps, and related other items to maintain and repair more than 8,000 miles of pipe and 70 pump stations.

In Development charlotte water

Charlotte Water / Construction

Belmont Force Main Construction

  • Posting Number: 2024-Q4(Oct-Dec)-CW-12289
  • Anticipated Posting Date: 2024-12-01
  • Last Updated: 08/02/23
Add to Calendar 2024-12-01 2024-12-01 Belmont Force Main Construction

This project will deliver a new lift station and force main to convey wastewater flow from the City of Belmont to Charlotte Water’s Stowe Regional Wastewater Reclamation Facility via Charlotte Water’s Paw Creek Pump Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.

In Development charlotte water

Charlotte Water / Construction

Belmont Horizontal Directional Drilling Construction

  • Posting Number: 2024-Q4(Oct-Dec)-CW-12291
  • Anticipated Posting Date: 2024-12-01
  • Last Updated: 08/02/23
Add to Calendar 2024-12-01 2024-12-01 Belmont Horizontal Directional Drilling Construction

This project will deliver a new lift station and force main to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional WWRF via CLTWater’s Paw Creek Pump Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at This facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of Design and three separate construction contracts.

In Development charlotte water

Charlotte Water / Construction

Belmont Pump Station Construction

  • Posting Number: 2024-Q4(Oct-Dec)-CW-12294
  • Anticipated Posting Date: 2024-12-01
  • Last Updated: 08/02/23
Add to Calendar 2024-12-01 2024-12-01 Belmont Pump Station Construction

This project will deliver a new pumping station and pressurized pipe to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional Wastewater Reclamation Facility via CLTWater’s Paw Creek Pumping Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.

In Development charlotte water

Charlotte Water / Technology Goods & Services

Automatic Meter Reading (AMR) Replacement Phase 3 Construction

  • Posting Number: 2024-Q2(Apr-Jun)-CW-12271
  • Anticipated Posting Date: 2024-06-01
  • Last Updated: 08/02/23
Add to Calendar 2024-06-01 2024-06-01 Automatic Meter Reading (AMR) Replacement Phase 3 Construction

This project will upgrade the existing meter reading system to a self-reporting network and replace end of life residential meters. Existing communication endpoints not compatible with the network selected will be replaced. Most residential meters will be replaced; those meters not replaced will require a replacement register compatible with the new endpoints. Commercial meters will receive replacement registers or be replace, depending on compatibility with the selected network solution. The communication network, hourly interval data and customer access portal will improve customer experience, increase billing efficiency and accuracy, reduce system losses and operational expenses, and improve system monitoring and planning.

In Development charlotte water

Charlotte Water / Construction

Lift Station Improvements Phase 4

  • Posting Number: 2025-Q2(Apr-Jun)-CW-12265
  • Anticipated Posting Date: 2025-06-01
  • Last Updated: 08/01/23
Add to Calendar 2025-06-01 2025-06-01 Lift Station Improvements Phase 4
Provides for the rehabilitation of 10 to 12 sanitary sewer lift stations. Modernization of electrical and controls, installation of flow measurement equipment and miscellaneous safety and security upgrades as deemed needed on a per site basis.

In Development charlotte water

Housing & Neighborhood Services / General Services

Unspecified Demolition and Environmental Services

  • Posting Number: 2023-Q3(Jul-Sep)-HNS-8538
  • Anticipated Posting Date: 2023-09-30
  • Last Updated: 07/20/23
Add to Calendar 2023-09-30 2023-09-30 Unspecified Demolition and Environmental Services

The City anticipates selecting one (1) or more firms for On‐Call Services to include securing structures, asbestos abatement, utility coordination/relocation, demolition, clearing and grading of specified structures and related improvements, underground storage tank, and contaminated soil removal, well abandonment, tree removal, and miscellaneous environmental remediation. Services may be planned or as a result of an emergency and do not fall within the confines of an existing project’s contract. Most demolition services are urgent in nature and required to protect the health, welfare, and safety of our residents.

1 2 17 18 19