Opportunities per Page
Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.
From Date
To Date
Opportunities per Page
Department of General Services / Construction
McCullough Drive Extension
Department of General Services / Construction
Shamrock Drive Complete Street
Project limits are from Beckwith Place to Flamingo Ave (0.9 miles). Project includes new turn lanes, sidewalks, painted buffered bike lanes, two roundabouts, wheelchair ramps, ped medians, driveways, curb and gutter, storm drainage, street trees, public art and pedestrian crossings.
Charlotte Water / Construction
McDowell Creek WRRF Primary Clarifier Rehabilitation
Charlotte Water / Construction
Fiscal Year 2026 Street Main Extensions Contract 3
This contract will focus on the construction of street main extensions and other necessary infrastructure projects. It will also serve as an on-call contract for capital project construction support. The work will be performed throughout Charlotte Water’s service area, ensuring continued system reliability and expansion where needed.
Charlotte Water / Construction
Fiscal Year 2026 Street Main Extensions Contract 2
This contract will include the construction of street main extensions and various infrastructure projects. The contract will provide construction assistance for other capital projects as needed. It covers the entire Charlotte Water service area, ensuring water distribution system improvements.
Charlotte Water / Construction
Fiscal Year 2026 Street Main Extensions Contract 1
This contract includes the construction of multiple street main extensions and other miscellaneous infrastructure projects. It will provide construction assistance on an as-needed basis for other capital projects. The scope covers the entire Charlotte Water service area, ensuring water distribution system improvements where necessary.
Charlotte Water / Construction
Belmont Horizontal Directional Drilling Construction-cancelled
Charlotte Water / Construction
Lift Station Improvements Phase III – cancelled
Charlotte Water / Architectural / Engineering Services
Upper Little Sugar Creek Interceptor Design-cancelled
Charlotte Water / Construction
Sugar Creek Water Resource Recovery Facility (WRRF) Ultraviolet (UV) D ... Sugar Creek Water Resource Recovery Facility (WRRF) Ultraviolet (UV) Disinfection System Upgrades
Charlotte Storm Water Services / Construction
Collective AD Storm Drainage Improvement Program
Collective Storm Drainage Improvement Projects Series AC will involve 3 projects throughout the City of Charlotte, 4213 Tipperary Pl, 2607 Vail Ave, 4600 Randolph Rd. 4213 Tipperary Pl will consist of a reinforced box culvert replacement as well as reinforced concrete pipe replacement and realignment, CIPP liner, storm drainage structure replacement, full depth asphalt, curb and gutter, concrete driveway, new sanitary sewer pipe and sanitary sewer structures, as well as sidewalk replacement all along Tipperary Place. 2607 Vail Ave will reroute water along Vaile Ave that will consist of new storm drainage pipe and structures as well as sanitary sewer line replacement, concrete driveway and curb replacement, as well as full depth asphalt replacement. 4600 Randolph Rd will consist of CIPP lining across Randolph Rd, a new reinforced concrete pipe alignment with structures, concrete curb, concrete driveway, full depth asphalt, and ditch work along commercial properties and an apartment complex.
Charlotte Storm Water Services / Construction
6th and Graham Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
An extension of McCullough Drive, from it’s current terminus east
of southeast of North Tryon Street, to the disconnected terminus
southwest of W.T. Harris Blvd. It is already designed and real
estate acquired. This is necessary for splitting this project apart
from the McCullough Streetscape Project. Length = 0.272 miles