Opportunities per Page
/ Opportunities
Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.
Department
- Aviation
- Charlotte Area Transit System
- Charlotte Communications & Marketing
- Charlotte Department of Transportation
- Charlotte Fire Department
- Charlotte Mecklenburg Police Department
- Charlotte Planning, Design & Development
- Charlotte Storm Water Services
- Charlotte Water
- City Attorney’s Office
- City Clerk
- City Manager's Office
- City Wide
- Community Relations
- Department of General Services
- Economic Development
- Finance
- Housing & Neighborhood Services
- Human Resources
- Innovation & Technology
- Internal Audit
- Solid Waste Services
- Strategy & Budget
Solicitation Category
- Architectural / Engineering Services
- Commodities & Goods
- Construction
- Construction Cost Estimating
- General Services
- Technology Goods & Services
Utilization
- SBE-Small Business Enterprise
- DBE-Disadvantaged Business Enterprise
- MBE-Minority Business Enterprise
- WBE-Women Owned Business Enterprise
Expected Release Date
From Date
To Date
Estimated Total Value
- $10,000 - 49,999
- $50,000 - 99,999
- $100,000 - 249,999
- $250,000 - 499,999
- $500,000 - 999,999
- $1,000,000 -4,999,999
- $5,000,000 - 9,999,999
- $10,000,000+
In Development
Charlotte Storm Water Services / Construction
Rounding Run Storm Drainage Improvement Project
In Development
Charlotte Storm Water Services / Construction
Piccadilly Storm Drainage Improvement Project
- Posting Number: 2026-Q1(Jan-Mar)-CSWS-8365
- Anticipated Posting Date: 2026-03-15
- Last Updated: 08/21/24
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
In Development
Charlotte Storm Water Services / Construction
Foxrun/Burtonwood Storm Drainage Improvement Project
- Posting Number: 2025-Q4(Oct-Dec)-CSWS-9838
- Anticipated Posting Date: 2025-11-03
- Last Updated: 08/21/24
This project is bordered by Rama Road to the north, McAlpine Creek to the south, Monroe Road to the east and Burlwood Road to the west. The drainage system consists of open channel and closed pipe systems underneath City maintained roads. This was previously identified as a major capital project from the watershed ranking prioritization process with a score of 54 of 100. The ranking protocol identifies 30 structures that experience flooding in the 100-year storm event and 16 roads that experience transverse overtopping events that do not meet current standards. A holistic project is needed to cost beneficially address the drainage system issues.
In Development
Charlotte Water / Construction
Belmont Force Main Construction
- Posting Number: 2025-Q2(Apr-Jun)-CW-12289
- Anticipated Posting Date: 2025-04-15
- Last Updated: 08/21/24
This project will deliver a new lift station and force main to convey wastewater flow from the City of Belmont to Charlotte Water’s Stowe Regional Wastewater Reclamation Facility via Charlotte Water’s Paw Creek Pump Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.
In Development
Charlotte Water / Construction
Belmont Pump Station Construction
- Posting Number: 2025-Q2(Apr-Jun)-CW-12294
- Anticipated Posting Date: 2025-04-15
- Last Updated: 08/21/24
This project will deliver a new pumping station and pressurized pipe to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional Wastewater Reclamation Facility via CLTWater’s Paw Creek Pumping Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.
In Development
Charlotte Water / Construction
Belmont Horizontal Directional Drilling Construction
- Posting Number: 2025-Q2(Apr-Jun)-CW-12291
- Anticipated Posting Date: 2025-04-15
- Last Updated: 08/21/24
This project will deliver a new lift station and force main to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional WWRF via CLTWater’s Paw Creek Pump Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of Design and three separate construction contracts.
In Development
Charlotte Water / Construction
FY26 Large Service Contract #1
- Posting Number: 2025-Q3(Jul-Sep)-CW-12283
- Anticipated Posting Date: 2025-09-01
- Last Updated: 08/21/24
This contract is for the continuous installation of large water and sewer services, as needed, for commercial or residential purposes with a diameter one and a half inches or larger. Customers apply for quotes for service connection and pay the applicable fees to get into the construction queue. This contract will help meet the demand for these kinds of service connections for the next two years.
In Development
Charlotte Water / Construction
Lift Station Improvements Phase III
- Posting Number: 2025-Q2(Apr-Jun)-CW-12263
- Anticipated Posting Date: 2025-06-17
- Last Updated: 08/21/24
Provides for the rehabilitation of 10 to 12 sanitary sewer lift stations. Modernization of electrical and controls, installation of flow measurement equipment and miscellaneous safety and security upgrades as deemed needed on a per site basis.
In Development
Charlotte Water / Construction
FY24 Water Main Replacement – Contract 1
- Posting Number: 2025-Q3(Jul-Sep)-CW-13336
- Anticipated Posting Date: 2025-08-20
- Last Updated: 08/21/24
This contract will consist of an undetermined number of individual projects consisting of water and/or sewer replacements, water and/or sewer extensions, and water distribution system reliability improvement projects, which will be assigned by the Project Engineer.
In Development
Charlotte Water / Architectural / Engineering Services
Upper Little Sugar Creek Interceptor Design
- Posting Number: 2025-Q3(Jul-Sep)-CW-12252
- Anticipated Posting Date: 2025-08-15
- Last Updated: 08/21/24
Design of Upper Little Sugar Creek Interceptor (at least Phase 1 from Wastewater Treatment Plant to East Boulevard). The complete project extends from Sugar Creek Wastewater Treatment Plant to Sugar Creek Rd.
In Development
Aviation / Construction
Asphalt Shoulder Rehabilitation-Phase II
- Posting Number: 2025-Q2(Apr-Jun)-AVI-13449
- Anticipated Posting Date: 2025-04-30
- Last Updated: 08/14/24
As part of the airfield master plan effort to repair runway and taxiway asphalt shoulders asphalt crack seal and replacement is needed to meet Part-139 FAA requirements. This project will re-construct and repair asphalt shoulders for Runway 18R/36L, Runway 18C/36C, Taxiway’s Echo, Whiskey, and Charlie.
The project includes erosion and sedimentation control, airfield asphalt paving and repair which meet FAA circular requirements.
In Development
Aviation / Commodities & Goods
Airfield Deicing Chemicals
- Posting Number: 2025-Q1(Jan-Mar)-AVI-12908
- Anticipated Posting Date: 2025-03-03
- Last Updated: 08/08/24
Provide airport with liquid and solid deicing chemicals during inclement winter weather events. Liquid and solid deicing chemicals are used throughout the facility to treat surfaces to minimize the formation of ice.
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.