This contract consists of an undetermined number of individual projects consisting of water and/or sewer replacements, water and/or sewer extensions, and water distribution system reliability improvement projects, which will be assigned by the Project Engineer.
Airport Customs & Border Protection Facility Renovations
This is a Construction Management at Risk (CM@R) project.
The Customs & Border Protection (CBP) Facility Renovation project demolishes and reconstructs all interior areas of the existing CBP Facility. The project also expands the terminal connector between Concourse D, & Concourse E, adding approximately 15,000 square feet of leasable space.
Shamrock Drive Storm Drainage Improvement Project
This construction project is located near The Plaza and Shamrock Drive and has been identified to address flooding, erosion, and pipe failure in the project area.
Fawnbrook Ln (514) Storm Drainage Improvement Project
The need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after the review is complete.
Mallard Water Reclamation Upgrades, Phase 1 Improvements
The Phase 1 Water Reclamation Upgrade will increase the capacity of the facility to 14.9 million gallons per day (MGD) and includes a new deeper influent pump station to accept flow from a new, deeper trunk sewer, flow equalization, influent screens, aeration control and chemical feed. The estimated construction cost for this upgrade is $65.2 million. The Phase 1 construction project will also include solids improvements that are estimated at $24 million. Both aspects of the project will be delivered together as a single construction project.
Glassy Creek/Brentwood/Parkwood Stream Restoration
This stream restoration construction project provides for the upgrading of lakes and ponds, dam repairs, and other improvements to reduce the level of pollution in stormwater. The need for the project is based on the maintenance of facilities such as lakes and ponds that enhance stormwater quality under the requirements of the Clean Water Act.
South Tryon St Intelligent Transportation System
This project will install approximately 2.1 miles of 24 count single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for eight existing traffic control cabinets and the installation of six traffic management cameras. The project limits are S Tryon Street beginning at West Boulevard to Clanton Road and then along Clanton Road to Barringer Drive. This project also includes fiber splicing, testing, Ethernet equipment communications, traffic management cameras and equipment and other related activities.
Crestmont Drive (4724) Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after the review is complete.
2831 Flintridge Drive Storm Drainage Improvement Project
The 2831 Flintridge Drive Project will include the replacement of approximately 340LF of 48″ CMP with new 7’x3′ RCBC between open drainage channels behind 2831 and 2816 Flintridge Drive. The 7’x3′ RCBC installation will vary between 9-14 feet deep and will require active shoring approved by a professional engineer.