The Fourth Parallel Runway Program – North End-Around Taxiway (NEAT) Extension – Volume I includes the construction of 75 feet wide x 5,300 feet long new taxiway with two connector taxiways. Primary work elements include 18-inch Portland cement concrete pavement; cement-treated base course; crushed aggregate base course; asphalt shoulders; pavement markings; mass grading; 15” – 84” drainage pipes; cast-in-place and pre-cast structures; underdrains; airfield electrical including duct banks, cabling, lighting, and signage; erosion control; asphalt service roads; and fencing. The project also includes Stockpile Site – Volume II. Primary work elements include pavement, slab on grade, and foundation demolition; building demolition; utility removal; asphalt roadway; waterline installation; mass grading; erosion control; and fencing.
Vest Water Treatment Plant Clearwell No. 3 Roof Replacement
The Vest WTP’s Clearwell No. 3 existing precast concrete panels which already had its existing TPO Membrane roof demolished will be replaced with a new FRP Deck and TPO Membrane roof.