|
The project will install pedestrian and bicycle facilities to connect Park South Drive to Park Road. Project will construct asphalt trail and pedestrian signals on Park Road and Park South Drive. Work also includes construction of concrete curb and gutter, curb ramps, storm drainage, traffic control and pavement markings. |
On-Call Materials Testing CANCEL
As part of the airfield master plan efforts to repair runways, taxiways, shoulders, and apron materials testing is needed to meet inspection requirements for placement of concrete and asphalt. The project includes inspection sample cores and final data reports for all pavement materials placed on the airfield. All work shall conform to FAA circular requirements.
4th Parallel Runway Package 2: Runway
As part of the Fourth Parallel Runway Program at CLT, this construction package will include the construction of new Runway 1C-19C and its connector taxiways. The project includes erosion and sedimentation control, grading, drainage, fencing, vehicle service roads, miscellaneous utilities, airfield concrete and asphalt paving, marking, airfield lighting/signage, and approach lighting infrastructure.