Charlotte Water will be seeking proposals for Water Transmission Line Easement Clearing Services. These services would potentially require heavy clearing of brush, including possible tree and stump removal, for properties in which access to water transmission line easements must be maintained by Charlotte Water. Service areas and boundaries will be identified by Charlotte Water. The selected firm or firms shall also be responsible for the removal and disposal of vegetation.
Once initial clearing has been completed, scheduled maintenance clearing of the easements will be planned with a standard frequency.
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.
The Project consists of the repaving of two different Charlotte Water Facilities: Zone 1 which is located at 11609 Hord Drive Huntersville, NC 28078, and Zone 2 located at 5730 General Commerce Drive Charlotte, NC 28213. Zone 1 encompasses additional aspects besides the repaving, including a proposed storm drainage system, water and sanitary sewer extensions, and the enlargement of the existing detention pond. Zone 2 includes some storm drainage, curb and gutter, and concrete apart from the repaving.