Landscape Maintenance Zone 3

The Charlotte Douglas International Airport (CLT) seeks to award a contract for Landscaping Maintenance Services of common areas including facilities, roadways, field & drainage areas and inclusive of turf, shrubs, ground cover and trees, mulching, fall over seeding, bedding areas, annual color, trash control, and chemical application. Zone 3 is primarily roadway moving with limited bedding areas.

All work must meet accepted standards as set forth in industry documents and this scope of services. The Contractor must be able to perform the majority of work each weekday (Monday – Friday) with litter control occurring each day of the week including weekends. Work may on occasion be required on Saturday or at night to accommodate traffic and safety concerns upon the
site.

Work is divided between regular maintenance which is performed daily or weekly and yearly maintenance listed as annual for work that occurs an average of one each year. The Contractor shall furnish all material, labor, tools, supplies, equipment, transportation, superintendence, insurance, taxes, contributions and all services and facilities unless specifically excepted, required to maintain the property

Zone 4 Field Operations Center (Construction Manager-at-Risk)

The proposed Zone 4 project will include a 36,000 sf operations center, approximately 20,000 sf of pre-engineered metal structures to house open storage, crew storage, raw materials bunkers, two (2) combination trucks, fabrication shop, and two (2) fleet maintenance bays.  The project will also include demolition of existing facilities in a phased approach so as to minimally impact or impede current operations on the site. The project may also include roadway improvements to West Tyvola Road to increase accessibility to the site.

Rodgers Builders was selected as the Construction Manager at Risk (CMAR)  for this project.

 

Pleasant Grove Road Sidewalk- Cancelled

This project will construct sidewalk along the south side of Pleasant Grove Road from Hipp Road to Oakdale Elementary School.   This project has been cancelled.

Shade Valley Realignment Project

Construction of a roundabout at the Shade Valley Road/ Oakhurst Commons Drive intersection and installing a 10 to 12 ft. concrete multi-use path along Monroe Road. Amenities include: sidewalk curb & gutter, planting strips, accessible ramps truck apron, pedestrian refuge islands, and a sand filter stormwater detention pond.

Oakhurst/ Amity Gardens Multi-Use Path (Landscaping) CANCELLED

Landscaping (trees and shrubs) for a 12 ft. concrete multi-use path between the Oakhurst and Amity Gardens neighborhoods. The path itself contains two pedestrian bridges, lighting, trash receptacles, two retaining walls, handrails, benches, and dog waste stations.

Matheson Avenue Bridge Streetscape

This project will incorporate pedestrian, bicycle and bridge improvements on Matheson Avenue from North Tryon Street to Jordan Place. The project will include a westbound one-way bicycle path along the north side of Matheson Avenue and a two- way bicycle path and sidewalk along the south side. Both sides will include a three-foot buffer between the bicycle paths and the road.

Water Transmission Line Easement Clearing Services

Charlotte Water will be seeking proposals for Water Transmission Line Easement Clearing Services. These services would potentially require heavy clearing of brush, including possible tree and stump removal, for properties in which access to water transmission line easements must be maintained by Charlotte Water.   Service areas and boundaries will be identified by Charlotte Water.   The selected firm or firms shall also be responsible for the removal and disposal of vegetation.

Once initial clearing has been completed, scheduled maintenance clearing of the easements will be planned with a standard frequency.

 

Storm Water Repair and Improvement FY2021-A

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.

Site Improvements at Charlotte Water’s Field Operations, Zone 1 & 2

The Project consists of the repaving of two different Charlotte Water Facilities: Zone 1 which is located at 11609 Hord Drive Huntersville, NC 28078, and Zone 2 located at 5730 General Commerce Drive Charlotte, NC 28213. Zone 1 encompasses additional aspects besides the repaving, including a proposed storm drainage system, water and sanitary sewer extensions, and the enlargement of the existing detention pond. Zone 2 includes some storm drainage, curb and gutter, and concrete apart from the repaving.