Firehouse 44 will be an integral asset to support Charlotte Fire Department’s efficient response to emergencies in the community; providing a location within the newly developed River District community and expanding their response area in this newly incorporated region of Charlotte. This 14,600 SF, two-story, 3-bay facility will be the first mass timber firehouse in the Southeast US and will meet Living Future’s (LF) Zero Carbon certification for total project embodied carbon. The project will comply with Charlotte’s Sustainable Facilities Policy and fully support the sophisticated and time-sensitive operations of the Fire Department.
CMGC- ADA Implementation – Ph 2 – Highrise & Parking Deck
This project will address the non-conforming, physical ADA barriers to the greatest extent feasible and where applicable under code provisions. Phase 2 includes the Charlotte-Mecklenburg Government Center and adjacent Parking Garage. Scope areas include Exterior Plaza, Entrance Lobby, 2nd Floor Mezzanine and the 15-story Highrise. Specific scope includes, but is not limited to, Partitions, Doors and Door Hardware, Ramps, Millwork, Restrooms, Controlled Access, Obstructions, Plaza Deck and Accessible Routes. The project delivery method is Construction Manager at Risk (CMAR). The CMAR will commence with CBI outreach ~3rd qtr 2025 and trade partner pre-qualification ~4th qtr 2025.
Landscape Management
This contract will provide landscaping services at various Charlotte Water locations. Work may include mowing, tree trimming, and general upkeep of facility grounds. The task is to maintain these areas, improving site aesthetics and safety.
Wastewater Treatment Site Landscape Management
This contract will provide landscaping services at various Charlotte Water wastewater treatment locations. Work may include mowing, tree trimming, and general upkeep of facility grounds. The task is to maintain these areas, improving site aesthetics and safety.
Storm Water Repair and Improvement FY2025 G
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drainpipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, landscaping, and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer relocations, installations and adjustments. Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential, and commercial properties.
Storm Water Repair and Improvement FY2024-G
Work performed under this contract will consist of storm water infrastructure maintenance, repair and improvement projects within the city limits of Charlotte, NC. Work may include but is not limited to mobilization, earthwork, installation of storm drainage structures and pipes/culverts, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm drainage structure and pipe repair and/or rehabilitation pipe lining, water and sanitary sewer (relocations, installations, and adjustments). Locations of work will vary and can be within public right of way, private property with easements or a combination of both.
On Call Grounds Maintenance Services
The City of Charlotte (City) plans to contract with one or more firm(s) to provide On-Call grounds maintenance services for various locations within the City of Charlotte and surrounding areas.
The Contractor shall provide all labor, equipment, supplies, and materials required to provide Grounds Maintenance for city owned properties. consists of but may not be limited to grounds maintenance, turf maintenance, shrub maintenance, groundcover maintenance, perennial maintenance, trash and debris removal, storm debris pickup, irrigation maintenance/ repair/operation, snow and ice removal, tree maintenance, and mulching, pesticide and herbicide application.
The Contractor agrees to an understanding of the current edition of the City of Charlotte-Landscape Management Division’s Landscape Construction Standards and to comply with the specifications and requirements described in this Contract.
The Contractor shall comply with applicable laws regulating the practice of pesticide applications as required by the NCDA. The Contractor will be required to continuously have at least one full-time employee on staff with the required license throughout the entire term of the contract.
CMGC- ADA Implementation – Ph 2 – Highrise & Parking Deck
This project will address the non-conforming, physical ADA barriers to the greatest extent feasible and where applicable under code provisions. Phase 1 addressed barriers in the Charlotte Mecklenburg Government Center Chamber Space, while this Phase 2 addresses all other spaces, including the adjacent parking garage. Scope areas include Exterior Plaza, Entrance Lobby, 2nd Floor Mezzanine and the 14-story Highrise. Specific scope includes, but is not limited to, Partitions, Doors and Door Hardware, Ramps, Millwork, Restrooms, Controlled Access, Obstructions, Plaza Deck and Accessible Routes. The project delivery method will be Construction Manager at Risk. A separate RFQ will be solicited for these services.
Miranda Road Firehouse 46
A new infill firehouse will be designed and constructed at 4032 Miranda Road to alleviate high call volumes and meet response time standards in the area. The firehouse will reflect the design of Firehouse #45, a 3-bay, 2-story firehouse programmed for approximately 14,600 square feet. The proposed facility will be located at the corner of Beatties Ford Road. Parcel #03741123 is approximately 6.54 acres. This location and site selection meets the City of Charlotte Policy for Sustainable City Facilities and Charlotte Fire Department Facilities Master Plan.