Upper Little Sugar Creek Replacement Sewer – Phase 2 and Phase 3 from Bilmark Avenue to Canterwood Drive and 911 Georgetown Storm Drainage Improvement Project (SDIP)

The Project consists of the installation of 250 LF of 8” sewer; 3,060 LF of 16” sewer; 3,100 LF of 18” sewer; 37 manholes; bypass pumping of wastewater; and other related sewer installation/replacement work for the Upper Little Sugar Creek Replacement Sewer Phases 2 and 3 portions. For the 911 Georgetown SDIP, the project consists of the Installation of 394 LF of 5’ X 4’ Precast R.C. Box Culvert; 60 LF of 10’ X 8’ Precast R.C. Box Culvert; 9 masonry drainage structures; and other related storm drainage installation work.

Lakeview Road Improvements

This project spans approximately 1.5 miles and will add transportation capacity along Lakeview Road from Cushing Drive to Old Statesville Road to accommodate the additional traffic expected as a result of the construction of NCDOT’s I-77 Lakeview Road Direct Connect Interchange project. Improvements under this project will include pavement upgrades, intersection modifications, additional through/turning lanes, upgrading drainage infrastructure, and pedestrian and bicycle facilities.

Collective Series J Storm Drain Improvement Project

The Collective Storm Drainage Improvement Project (SDIP) Series J contains three separate projects which vary in size and each bring their unique differences. The work involves various storm drainage improvements including replacement of storm drainage pipes, culvert, masonry drainage structures, water line, sewer line, asphalt pavement, concrete driveways, concrete sidewalk and concrete curb. These improvements will realign storm drainage to reduce structure flooding and address failing infrastructure. Due to the complexity of these projects and their proximity to utility poles/structures/retaining walls, active shoring will be required.

N. Tryon St- 36th St. Streetscape

The project will provide infrastructure improvements that include sidewalk, curb and gutter, milling- resurfacing, pedestrian refuge and signals, cross walks, planting strips, street trees, pedestrian and street lighting, bike lanes, and on-street parking. The project will provide 0.4 miles of streetscape along 36th street between North Tryon Street and Davidson Street. The project will tie into the Blue Line Extension project on 36th street.

Specialized Roadway Construction Services FY22D

This unspecified contract will provide horizontal construction services on an as-needed basis to the Engineering Department. The work includes traffic control, erosion control, clearing and grading, drainage, milling, asphalt paving, pavement markings, retaining wall, concrete curb, sidewalk, driveways, pedestrian refuge island and wheelchair ramps, utility relocation and installations.

Specialized Roadway Construction FY22C

This unspecified contract will provide horizontal construction services on an as-needed basis to the Engineering Department. The work includes traffic control, erosion control, clearing and grading, drainage, milling, asphalt paving, pavement markings, retaining wall, concrete curb, sidewalk, driveways, pedestrian refuge island and wheelchair ramps, utility relocation and installations.

Specialized Roadway Construction Services FY22A

This unspecified contract will provide horizontal construction services on an as-needed basis to the Engineering Department. The work includes traffic control, erosion control, clearing and grading, drainage, milling, asphalt paving, pavement markings, retaining wall, concrete curb, sidewalk, driveways, pedestrian refuge island, and wheelchair ramps.

I-277 Rail Trail Bridge – Construction

This project will construct a pedestrian bridge over I-277 to connect South End to Uptown. The bridge will be located just west of the existing light rail bridge and will include aesthetic elements to create a signature design. It will also include a new pedestrian rail crossing on the Morehead landing area and will tie the Stonewall plaza into the existing light rail platform.

Westbourne Storm Drainage Improvement Project

The project area covers approximately 20 acres and is roughly bounded by Old Plank Road to the north, Larkhaven Road to the east, Westbourne Drive to the west, and Bellhaven Boulevard to the south. The project includes storm drain improvement including culvert replacements, repair of aging and deteriorating storm drains by way of pipe system upgrades, and channel stabilization improvements. The project also includes water line upgrades and sanitary sewer relocations along with road resurfacing and seeding in affected project areas.