This project will construct a shared-use path along the west side of Old Concord Road from Meadow Vista Road to Arlyn Circle. Construction of driveway improvements and wheelchair ramps are included in this scope. The construction of the shared-use path will help to improve safety and walking conditions for citizens along this minor thoroughfare. This project will also connect several miles of pedestrian walkways within this area. Old Concord Road Shared-Use Path is considered a high priority project based on CDOT’s sidewalk Priority list and was requested by the residents and business owners in the area. Improvements for Charlotte Water are also included in the project scope. Project Length= .85 miles.
Kuykendall Road Improvements
This project will connect sidewalk along Kuykendall Road from
Thorn Blade Drive to McKee Road, and add a right-turn lane from
Kuykendall Road on to McKee Road in order to to increase
pedestrian safety and help alleviate traffic congestion at the
intersection. Project will also fill in small sidewalk gap on the south
side of McKee Rd at Kuykendall Rd and add pedestrian signals with
crosswalk at this intersection. Project length = approximately 0.75
miles.
Storm Water Repair and Improvement FY2025 E
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, , and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.
Storm Water Repair and Improvement FY2025 G
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drainpipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, landscaping, and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer relocations, installations and adjustments. Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential, and commercial properties.
Lawyers Rd SW (Harri Ann to Chestnut)
The scope of this project will include 0.34 miles of new 6ft wide concrete sidewalk, driveway improvements, and wheelchair ramps on Lawyers Rd from Chestnut Lake Dr to Harri Ann Dr.
Belk Greenway Connector
Belk Greenway Connector is a cycle track project. This project will involve shifting the medians on McDowell St to make room for the cycle track, replacing noncompliant curb ramps, replacing noncompliant pedestrian signals, transferring signal heads to new mast arms, mill & overlay, pavement markings, sign installation, and the removal of 4 median trees.
Arrowood at Whitehall Commons Intersection
This is an intersection project which will involve installing a new traffic signal with pedestrian signals, widening some of the approaches, replacing all curb ramps, mill & overlay, and pavement markings. The traffic signal will use steel strain poles.
Storm Water Maintenance, Repair, and Improvement GLFY2025-B
Work performed under this grouting and lining (GL) contract will consist of stormwater infrastructure maintenance, repair, and improvement projects within the city limits of Charlotte, NC. Work may be located entirely within or a combination of public right-of-way and private, residential, and commercial properties. Work includes but is not limited to the following: Grouting and lining of existing storm drainage pipe, structures or soil stabilization cleaning; maintenance/repair and installation of storm drainage pipe systems, storm drain manholes, inlets, and end treatments; channel grading, blockage/sediment removal and outfall/bank stabilization; water, and sewer relocations, installations, and adjustments, structural foundation protection and construction of sidewalks, curb and gutter, and asphalt and concrete paving associated with the specific Project Work Order (PWO).
All work will be issued in writing to the contractor via a Project Work Order. PWO’s issued through this contract may vary in size, effort, location, and monetary value. Projects could vary from $2,000 to $60,000 with project durations from 2 to 60 calendar days. These ranges are provided as a guide and are not intended to be construed as the minimum and maximum cost or duration. The Contractor will be required to furnish and maintain a minimum of 1 full-time crew to work continuously on this contract for the entire contract duration. Each crew that works must be capable of prosecuting the work listed in the Project Work Orders in accordance with section 108-1. The Contractor shall keep the city informed of their proposed work plan(s) and submit written reports of work accomplished on a frequency to be determined by the city.
The Contractor may be required to submit a written construction schedule to the city for their review and approval. Submitted Project Construction Schedules (PCS) shall be in accordance with City Standard Provision Periodic Payments. Written reports and supporting construction documentation (survey notes, certifications, tickets, tags, etc.) shall accompany all pay requests. All work shall be subject to inspection by the City and/or their representative at any time.
Storm Water Maintenance, Repair, and Improvement – TR2025
Work performed under this transportation repair (TR) contract will consist of storm water infrastructure maintenance, repair and maintenance projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties. See section 1.28 – Scope of Work for additional details and information.