Limits are from Woodland Dr. to just south of Havenwood Rd. / Kilborne Dr. intersection (.87 miles). The project includes a new urban greenspace named Potter Place (including public art), separated bike lanes, protected intersection improvements at Central Ave., wayfinding, storm drainage, street trees, and pedestrian medians.
Beatties Ford Rd. Sunset Pedestrian Improvements Phase 1
This project will improve the pedestrian and bicycle facilities on Sunset Road from Day Lilly Lane to Beatties Ford Road. Project length is approximately 2.12 miles. The work includes construction of concrete sidewalk, curb & gutter, curb ramps and driveways, drainage, grading, erosion control, traffic control, asphalt pavement, pavement markings and water & sanitary sewer improvements.
Prosperity Church Road (Old Ridge to Benfield) Improvements
The project proposes to widen Prosperity Church Rd approximately 0.3 mi between Old Ridge Rd and Benfield Rd to provide curb and gutter, sidewalk, storm drainage, bicycle lanes, and on-street parking, as well as a roundabout at Prosperity Church Rd and Prosperity Ridge Rd.
FY 2023 Sidewalk Gaps (Sidewalk Gaps and Ramps FY 2023)
This project installs small sections of sidewalk and accessible ramps throughout Charlotte.
Brown Grier Road Upgrades
This project will widen the two-lane road to a four-lane median-divided road with multi-use paths between Steele Creek Road and Whitehall Park Drive, and a multi-use path north along Sandy Porter Road to the subdivision at Williams Glenn Road.
Beatties Ford Rd (LaSalle- Oaklawn) Sidewalks Ph. 1
This project will add sidewalks and amenities along Beatties Ford Rd between LaSalle St and Oaklawn Ave.
Morris Field Bridge Replacement
This project will replace the bridge on Morris Field Drive between Wilkinson Boulevard and Golf Acres Drive, over the Norfolk Southern Railroad.
University Research Park Sidewalk
This project will install sidewalk and multi-use paths in three locations within the University Research Park area. Locations will include a 6′ concrete sidewalk along Medical Plaza Drive between Harris Boulevard and Mallard Creek Road, a 12′ concrete multi-use path from the intersection of David Taylor Drive and Claude Freeman Drive to the intersection of Governor Hunt Road and David Taylor Drive and a 12′ concrete multi-use path along Claude Freeman Drive from the intersection of David Taylor Drive and Claude Freeman Drive to the first business entrance at the Left side of Claude Freeman Drive. (10330 David Taylor Dr). This project will also install curb ramps, retaining wall, curb and gutter, extension of 3 culverts, concrete headwall, pedestrian lighting and related works.
I-85 North Bridge (Rebid)
This project will construct a bridge over I-85 to directly connect Doug Mayes Place and Louis Rose Place. This will relieve congestion at the WT Harris Blvd/ I-85 and Mallard Creek Church Rd/ I-85 interchanges.