Advanced Metering Infrastructure Installation Services

Charlotte Water, a Department of the City of Charlotte NC, intends to advertise a Request for Proposals (RFP) to contract labor services to deploy an Advanced Metering Infrastructure (AMI) system for all of its approximately 325,000 water meters (collectively, the “Project”). Charlotte Water is issuing a separate RFP for the AMI system hardware and software (the “System”), and Charlotte Water intends to engage in one contract with the successful AMI system proposer. Furthermore, Charlotte Water expects the successful labor services  proposer to act as sub-contractor to the successful AMI System proposer under one contract to install the complete AMI System. This will allow Charlotte Water to evaluate Installation Companies separate from AMI systems and make selections of the system and the installer independently while still managing one contract during the implementation phase.

The basic components of the Project sought by Charlotte Water include the following:

  • Installation of new meters, retrofit registers (if applicable), and AMI meter interface units (MIUs)
  • Handheld devices and software necessary to program and/or initialize the MIUs and collect installation data
  • The design, installation, and testing of information interfaces between the AMI system’s software components and Charlotte Water’s customer information system (CIS) and other systems, such as its field work order system
  • All related documentation, including technical manuals and operating procedures
  • Training of Charlotte Water’s employees in MIU installation
  • Managing the inventory of AMI equipment during the course of project deployment
  • Satisfactory testing of all software, hardware, and procedures prior to the deployment of the system according to the system testing and acceptance process set forth in the contract
  • Coordination, scheduling, communications, and documentation of all installation services

Beatties Ford Sidewalk Phase 1

This project will improve the curbs, driveway, sidewalks and ramps for Beatties Ford Road between Russell Avenue and Lasalle Street. Concrete shall be 6-inch Portland cement, asphalt shall be two-inch course and four-inch intermediate course. Gravel shall be six-inch incidental stone. Limits of proposed slopes are indicated in the plans. The contractor shall maintain erosion control devices in accordance with the appropriate city and state erosion and sediment control ordinances. Contractor shall sawcut existing asphalt and/or concrete surfaces prior to removal unless otherwise directed by the engineer. Project length is 0.281 miles.

Air Handler Unit #63 Replacement

The scope of this contract shall be to provide the installation of an air handling unit (#63) to provide the additional air flow and cooling needed to satisfy the heat load on this section of concourse “E”. The contract term is 90 days.

Airport Main Terminal Bagroom Conveyor Upgrades

This contract will be to provide the design, engineering, fabrication, transportation to/from the site, installation, removal, replacement, demolition, modifications, testing, and turning over in working order the Baggage Handling System conveyor equipment upgrades in compliance with specifications and drawings. Project estimated to be completed within a 6 months.