Air Handler Unit #63 Replacement

The scope of this contract shall be to provide the installation of an air handling unit (#63) to provide the additional air flow and cooling needed to satisfy the heat load on this section of concourse “E”. The contract term is 90 days.

Airport Main Terminal Bagroom Conveyor Upgrades

This contract will be to provide the design, engineering, fabrication, transportation to/from the site, installation, removal, replacement, demolition, modifications, testing, and turning over in working order the Baggage Handling System conveyor equipment upgrades in compliance with specifications and drawings. Project estimated to be completed within a 6 months.