This purpose of the Bryant Farms Road Extension, Phase II project is to continue the street connection of Bryant Farms Road between Rea Road and Ardrey Kell Road. The design is anticipated to include a two-lane road with turn lanes, shared-use path on both sides of the road, and improvements at the intersections of Bryant Farms Road with Rea Road, Tom Short Road, and Ardrey Kell Road. The project will also build a crossing over Flat Branch stream and will run adjacent to the Flat Branch Nature Preserve for a portion of the project.
McCullough Drive Extension
An extension of McCullough Drive, from it’s current terminus east
of southeast of North Tryon Street, to the disconnected terminus
southwest of W.T. Harris Blvd. It is already designed and real
estate acquired. This is necessary for splitting this project apart
from the McCullough Streetscape Project. Length = 0.272 miles
Mallard Creek Road Shared-Use Path (Governor Hunt to Driwood)
This project will construct a shared-use path along the east side of Mallard Creek Road from Governor Hunt Road to Driwood Court. Specific improvements will also include construction of a plant strip, curb and cutter, accessible ramps, driveways, and potential storm drainage improvements. The purpose of this project is to improve pedestrian safety, mobility, and connectivity along Mallard Creek Road. Project Length = 0.4 miles.
Old Concord Road Shared-Use Path (Meadow Vista to Arlyn Cir)
This project will construct a shared-use path along the west side of Old Concord Road from Meadow Vista Road to Arlyn Circle. Construction of driveway improvements and wheelchair ramps are included in this scope. The construction of the shared-use path will help to improve safety and walking conditions for citizens along this minor thoroughfare. This project will also connect several miles of pedestrian walkways within this area. Old Concord Road Shared-Use Path is considered a high priority project based on CDOT’s sidewalk Priority list and was requested by the residents and business owners in the area. Improvements for Charlotte Water are also included in the project scope. Project Length= .85 miles.
Storm Water Repair and Improvement FY2025 G
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drainpipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, landscaping, and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer relocations, installations and adjustments. Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential, and commercial properties.
Resurfacing FY 2025-2026
This project consists of street resurfacing and its associated functions throughout the City of Charlotte. Resurfacing is not limited geographically as the possibility exists for paving to be performed anywhere within the city. The project includes traffic control, asphalt and concrete pavement milling, asphalt paving, base failure repair, asphalt surface treatment, utility adjustments, manhole frame and cover replacements, wheelchair ramp installation, sidewalk, curb repairs, bike program elements, and pavement markings.
Storm Water Repair and Improvement FY2024-G
Work performed under this contract will consist of storm water infrastructure maintenance, repair and improvement projects within the city limits of Charlotte, NC. Work may include but is not limited to mobilization, earthwork, installation of storm drainage structures and pipes/culverts, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm drainage structure and pipe repair and/or rehabilitation pipe lining, water and sanitary sewer (relocations, installations, and adjustments). Locations of work will vary and can be within public right of way, private property with easements or a combination of both.
Rea Road Widening (I-485 to Williams Pond Lane)
The purpose of this project is to increase capacity along Rea Road. Capacity will be increased by utilizing the right turn lane drops and median to develop an additional NB and SB through lane along Rea Road between the I-485 ramps and Williams Pond Lane. This project will also result in increased turn lane capacity and intersection improvements at Piper Station Drive and Ballantyne Commons Parkway. Pedestrian safety and mobility will be improved by providing sidewalks on both sides of Rea Road. Other specific improvements include: curb and gutter, accessible ramps, and driveways.
Advanced Metering Infrastructure Installation Services
Charlotte Water, a Department of the City of Charlotte NC, intends to advertise a Request for Proposals (RFP) to contract labor services to deploy an Advanced Metering Infrastructure (AMI) system for all of its approximately 325,000 water meters (collectively, the “Project”). Charlotte Water is issuing a separate RFP for the AMI system hardware and software (the “System”), and Charlotte Water intends to engage in one contract with the successful AMI system proposer. Furthermore, Charlotte Water expects the successful labor services proposer to act as sub-contractor to the successful AMI System proposer under one contract to install the complete AMI System. This will allow Charlotte Water to evaluate Installation Companies separate from AMI systems and make selections of the system and the installer independently while still managing one contract during the implementation phase.
The basic components of the Project sought by Charlotte Water include the following:
- Installation of new meters, retrofit registers (if applicable), and AMI meter interface units (MIUs)
- Handheld devices and software necessary to program and/or initialize the MIUs and collect installation data
- The design, installation, and testing of information interfaces between the AMI system’s software components and Charlotte Water’s customer information system (CIS) and other systems, such as its field work order system
- All related documentation, including technical manuals and operating procedures
- Training of Charlotte Water’s employees in MIU installation
- Managing the inventory of AMI equipment during the course of project deployment
- Satisfactory testing of all software, hardware, and procedures prior to the deployment of the system according to the system testing and acceptance process set forth in the contract
- Coordination, scheduling, communications, and documentation of all installation services