Mallard Creek Water Treatment Project includes the installation of approximately 1.4 miles of fiber optic cable in new directionally bored and trenched conduit and aerial attachments. This project also includes fiber splicing and testing. The project limits are from N Tryon Street between Pavilion Boulevard and Pilot Avenue and then along Pilot Avenue to a Charlotte Water building. Then there is fiber splicing work being performed at N Tryon Street and Ken Hoffman Dr and N Tryon Street and E Mallard Creek Church Rd in Charlotte, Mecklenburg County, NC. The Catawba Pump Station project includes the installation of approximately .93 miles of fiber optic cable in new directionally bored and trenched conduit and aerial attachments. This project also includes fiber splicing and testing. The project limits are from Mt Holly Huntersville Road between Brookshire Boulevard and Pump Station Road and then along Pump Station Road to a Charlotte Water building and Brookshire Boulevard and Lawton Road for 1000 feet in Charlotte, Mecklenburg County, NC.
Erwin Road and Byrum Drive Intelligent Transportation System Project
The Erwin Road ITS Project includes the installation of approximately 0.8 miles of fiber optic cable in new directionally bored conduit. This project also includes fiber optic cable splicing and testing. The project limits are Erwin Road and South Tryon Street to Erwin Road and Steele Creek Road in Charlotte, Mecklenburg County, NC. The Byrum Drive ITS Project includes the installation of approximately 2.7 miles of fiber optic cable in new directionally bored and trenched conduit and aerial fiber attachments to wood utility poles. This project also includes fiber optic cable splicing and testing. The project limits are West Boulevard/Steel Creek Road/Byrum Drive along Byrum Drive to Yorkmont Road/Byrum Drive and along Yorkmont Road to West Boulevard/Yorkmont Road and along West Boulevard to Billy Graham Parkway in Charlotte, Mecklenburg County, NC.